New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-03-01-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-03-01-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:31:58 AM
Creation date
6/1/2009 12:16:35 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Construction
Document_Date
3/6/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
\' <br />. one or more of the following stormwater functions: flood. control; habitat, streambank <br />stabl7i~ation, and water quafity treatment including pollutant .removal, shadmg and <br />temperature stabilization. <br />Responsl`ble person or responsl~ble party. A permit holder, property owner, or their <br />agent or contractor, or other person who is responsible for meeting the outcomes, or <br />responsl~ble for violation of this Rule. <br />Routine maintenance. .Activities and practices that are necessary to maintain the <br />operating capacity, functional integrity, or aesthetics of a place or facility. Routine <br />maintenance includes,. but is not limited to, landscaping, repair of recreation facl7ities (e.g., <br />ball diamonds, play areas, fields), cleaning of stornlwater fac>7ities, and patching of streets. <br />Secondary containment. On-site erosion prevention measures that include both a <br />.preventative measure .(soft coverage, vegetative buffer) and a control measure (sediment <br />fence, mulch berm, straw bales). <br />Sedimentation. The deposit of mud, sand, soli, sediment or construction materials <br />exceeding one-half cubic foot in vohurle for every 1,000 square feet of lot size onto adjacent <br />properties, into the City's stormwater system, onto Related Natural Resource Areas located <br />on site, into public rights ofway or private streets, and/or into any private stormwater system <br />that discharges into a City stormwater system located off-site by dropping; discharging; <br />directly depositing, or resulting from the action of erosion. <br />Sensitive azea. Sites that meet the criteria contained.in R-6.645-E.1. <br />Template. An example of a construction site management plan provided by the City <br />of Eugene that -when modified by the erosion prevention.permit holder to address site <br />specific conditions - can be used to satisfy CSMP requirements for a single dwelling or duplex <br />dwelling. The template may be prepared by the permit holder.or the permit holder's designee. <br />Untreatedrunoff Contaminated stprmwater runoff due to construction activities that <br />has not been filtered, screened, settled, or otherwise treated for the removal of pollutants, <br />prior to discharge into the City's stormwater system, designated buffers, or Related Natural <br />Resource Areas. <br />Water features. Permanent or intermittent bodies ofwazer, includmg creeks, streams, <br />ponds, rivers, lakes, Related Natural Resource Areas, drainage channels and jurisdictional <br />wetlands. .. <br />Vegetative buffer. A strip ofprotected land not less than 25 feet in width separating <br />ground disturbed by construction activity from awater feature, related natural resource area,. <br />or a property lme, whichever is nearest, containing vegetation at least 1 inch in height that <br />Administrative Rule - 7 <br />L:Cl'IiMYY13rn~ionl'~ev lav.wpd (1/13/3) <br />
The URL can be used to link to this page
Your browser does not support the video tag.