New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-03-01-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-03-01-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:31:58 AM
Creation date
6/1/2009 12:16:35 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Construction
Document_Date
3/6/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
practices under all weather conditions shall be kept at all times on the construction site: <br />2. When designing and implementing management BMP's to meet the above outcomes, <br />the applicant shall consider the seasonal variation ofrainfall, temperature, and oilier climatic factors <br />relative to the timing of land disturbance activities. All construction activity that will result in soil <br />disturbance during the wet weather season shall, at a minimum, implement and maintain the following <br />Best Management Practices (BMP) on site: <br />2.1 Construction site entrances shall be graveled with crushed rock of suhicient <br />size and grading as necessary to prevent any off-site tracking. <br />2.2 All stormwater facilities, water features, and Related Natural Resource Areas. <br />shall be protected <br />2.3 All exposed so>7 and stockpile areas not protected by perimeter control <br />consistent with an approved CSMP shall be covered <br />2.4 Seduneiit, so17, or construction related material shall be removed immediately <br />fromtheright-of--way, adjacent property, and the city's stormwater system, including water <br />features and Related Natural Resource Areas. <br />3. No permit or other approval issued pursuant.. to these rules snail be deemed to <br />authorize any violation of the above outcomes or wet-weather requirements. <br />R-6.645-E Desi~,nation of Sensitive Areas. <br />1. Criteria for. Sensitive Area Designation. For the purposes of adininistering these <br />Rules, any construction site that meets one or more ~ of the following criteria shall be considered a. <br />sensitive area for which an erosion prevention permit will be required: <br />1.1 The, slope of the pazcel in the azea of disturbance is greater than 10%; <br />1.2 .The site contains nighty erod~le sods; or <br />1.3 The pazcel or tax lot ofrecord has the potential to directly drain into a water <br />feature or its designated buffer azea <br />2. Determination of Sensitive Area. To assist with the adinuiistration of these <br />provisions, the City has prepared a rnap indicating sites that appear to meet the above criteria. -The <br />Public Work's Director, or designee, shall use this map to make a preliininary determination of a <br />site's sensitive area status. The map is on file at the City's Public Works Engineering Department <br />Administrative Rule -11 <br />L:Cl'I;MYW3SrosivoN~ev-2av.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.