New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-03-19-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-03-19-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:35:51 AM
Creation date
6/1/2009 12:16:13 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
ROW
Document_Date
1/14/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
made to the Rule as a result of this comment. <br />Now, therefore, based upon the above findings, which are hereby adopted, the findings in <br />Administrative Order No. 58-03-19, and pursuant to the authority contained in Section 2.019 of the <br />Eugene Code, 1971, I hereby repeal Administrative Order No. 58-00-13-F as of the effective date <br />of this Order, amend Construction Within and Use of the Public Way Rule R-7.302 and the Manual <br />attached as Exhibit A thereto as proposed in Administrative Order No. 58-03-19, and ratify and <br />affirm the unamended portions of Rule R-7.302 and the Manual attached thereto, so that R-7.302 <br />provides in full as follows: <br />CONSTRUCTION WITHIN AND USE OF THE PUBLIC WAY <br />ADMINISTRATIVE RULE R-7.302 <br />R-7.302-A Construction Within and Use of the Public Way - PolicX. <br />In order to create attractive and healthy neighborhood environments and protect the public's <br />right for the safe and unobstructed use of the public way, applicants wishing to perform work or <br />construction in, or to use, the public way shall first obtain a written permit and shall conform with <br />the standards and procedures provided for in these rules and the provisions, specifications, and <br />conditions contained within the manual on Utility and Ri t-of-Way Permits, Construction Within <br />and Use of the Public Way, Policies and Procedures, attached hereto as Exhibit A and adopted <br />herein. <br />R 7.302-B Definitions. <br />Applicant or Permit Applicant. The person who applies for aright-of--way work permit. <br />City Engineer. The Director of the Public Works Department of the City of Eugene, or the <br />Director's designee. <br />Conduit. An underground pipe or other structure constructed and used to contain lengths of <br />wire, cable or other transmission media. A conduit does not include pipes constructed and actively <br />used for the purpose of conveying natural gas, water, stormwater, wastewater, or other liquids. <br />Elevation view. The above ground height and width of a structure when viewed from the <br />center line of the public way at a point perpendicular to the structure. <br />GIS format. The format of electronic information, as established by the City Engineer for <br />incorporation into the City's Geographic Information System (GIS). <br />Inspector. Public Works Department personnel assigned to administer theright-of--way work <br />Administrative Order - 3 <br />C:\WINDOWS\Temporary Internet Files\OI.KB202\03rowr12a0 (00068460)1.WPD(01/07/04) <br />
The URL can be used to link to this page
Your browser does not support the video tag.