~. :. . <br />Comment 2: The portion of the second sentence of the first paragraph of R-7.280- ~ ~~` <br />A that states "Street trees shall be ...required on streets that abut the development ... " <br />should be more clearly defined. <br />Fin in The dictionary defines "abut" as "having a common boundary or to <br />border upon" . In order to clarify the intent of this section, it has been modified to provide <br />that "Street trees shall be ...required on that portion of street right-of-way that abuts lots <br />within the development. " <br />Comment 3: With respect to the location requirements of R-7.280-C.5, it is <br />impossible to know whether a customer would prefer a left hand driveway or a right hand <br />driveway until a particular lot is chosen and .sold. Locations of all utilities at the time of <br />plan approval can only be estimated.. There should be a variance provision subject to <br />relocation based on actual construction working drawings, which are not completed until <br />the. developer is ready to begin street construction. <br />'n in :The Local Street Plan establishes that the primary location for utilities <br />shall be within the public utility easement immediately outside the right of way. If that <br />location is infeasible; then the utilities may be located under the sidewalk; or within the <br />street. Only as a last resort may utilities be placed within the area reserved for trees. <br />However, R-7.280-C.5 has been revised and- language added to .allow review .and <br />conditional approval of estimated locations of utilities and driveways in some cases. <br />Comment 4: Under R-7.280-B.1, there is no mention of developmental phases. <br />Most large developments are completed in phases. The Street Tree Plan should be tied to <br />these phases. <br />Fin in :. The land use development process currently allows various ways this <br />can be accomplished. The Code requires the approval of the developer's Street Tree Plan <br />prior to final approval of the development. Most developers approach a large development <br />by requesting .approval for each phase as they are ready to proceed. In doing so these <br />street tree provisions would. only apply to the phase of development ready to proceed. <br />A Planned Unit Development (I'UD) final approval is good for a maximum of three <br />years, so at most, a developer could only phase construction within that approved PUD <br />which could be completed within that time frame without returning for another approval. <br />Another alternative would be for a developer to bring in a large PUD and receive tentative <br />approval on the larger development but then bring in each phase separately for final <br />approval. Therefore, the development process already has mechanisms in place to allow <br />final approval to be based on development phases, and no modification of the rules is <br />necessary. <br />Comment 5: The location standards of R-7.280-C.a should read "shall average as <br />Administrative Order - 2 <br />