System Valuation (value of existing + value of planned).- <br />Build-out Capacity;,(mgd) _ Cost per Unit of Capacity.'. <br />Per unit of capacity x flow peg PFU for development type x numberof PFUs for development <br />-SDC charge for development <br />Calculations for Non-Residential Development: <br />$87:241 M +' 8.609 M ,_ <br />_ $1.96 per_gal/day <br />48.9 mgd <br />$1'.:.96 xGal/PFU (varies by'development type) x number of PFUs'= <br />SDC charge for development. <br />1.3.2 Regional (MWMC) Wastewater System Cost of Service <br />Formulas: <br />Existing and increased plant Local <br />Equity related'to average flow Cost per gallon of <br />= average daily flow <br />Average daily design flow <br />Existing and increased plant Local <br />Equity related to peak flow Cost per gallon of <br />= peak daily flow <br />Average daily design flow <br />Existing and increased plant Local Equity <br />related to total suspended solids Cost per pound <br />= of suspended solids <br />.Design suspended solids <br />Calculations: <br />$16,037,000 <br />_ $0.327' {per gallon'of average daily.flow) <br />49;000,000 <br />City of Eugene SDC Methodology Fee Schedule & Formulas,. Page F-4 <br />