METHODOLOGY: <br />City of Eugene Systems Development Charges <br />Appendix F <br />Fee Schedule and Formulas <br />1.0 Formula and Calculation Details <br />1.1 General Rate Setting, Cost of Service Formula: <br />SDC eligible costs <br />= SDC per unit of service <br />Impact Measurement <br />1.2 Transportation System Cost of Service [add cost per trip for: street system ($510.08) <br />+ street system lighting ($130.98) + bicycle path system ($64.97) + bicycle path system <br />lighting ($8.05) =total cost per trip ($714.08]: <br />1.2.1 Street System Cost of Service <br />Formula• <br />Miles per trip <br />X Cost per lane mile = Cost per trip <br />Capacity per lane mile <br />Calculation: <br />0.7665 <br />X $449,187 = $510.08 (per trip) <br />675' <br />1.2.2 Street Light System Cost of Service <br />formula: <br />Miles per trip <br />X Cost per light = Cost per trip <br />Capacity per lane mile <br />Calculation: <br />0.7665 <br />I X $4,614 = $130.98 (per trip) <br />27 <br />City of Eugene SDC Methodology Fee Schedule & Formulas, Page F-1 <br />