New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-22-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-22-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:49:31 AM
Creation date
6/1/2009 12:09:52 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
2/15/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 1 <br />SUMMARY OF SYSTEMS DEVELOPMEN7C CHARGES <br />;;... Trarfspt~rtation. 1astewater-Local (G~ty.), Wastewater=Regroral (M1NMC) : . Stormwafer:.:<:>:<;.::::; >::... #'ar•ks:: <br /> Cost per trip = ' Cost per new residential Costs are based on the type of land Cost per square foot of Cost per <br /> $714.08 units (e.g., Ingle-family,... use and, for industrial dischargers impervious surface area = Dwelling Unit <br /> mobile home parks, with process flows, on the strength $0.159. Cost per single-family = $894.26 <br /> duplexes, apartments) = a of discharge. The rate varies by development (SFD) with buildin <br />~ base rate of $258 plus land use. The rate for a single footprint <3,000 sq. ft. _ <br />~ $0.062 per square foot of residential unit is $264.81 $511.98, or 23,000 sq. ft. _ <br />~ living area. Residential $767.97. Per Duplex = <br /> additions will be charged $1,023.96. For Manufactured <br /> $0.062 per square #oot of Home Parks = $267.76r~er <br /> increased living area. space plus cost per square <br /> Non-residential uses =$1.96 foot of additional impervious <br /> per gallon of area = $0.159. <br /> daily flow/discharge. <br /> Non-assessable Estimated non-assessable The reimbursement portion of the Estimated non-assessable Unit costs for <br />N <br />~ cost per lane mile cost of existing system charge is based on the net local cost of existing system using various <br />~ for collectors and using costs from "Gravity equity in the regional treatment plant -costs from "Infrastructure components <br />m arterials; costs of Sewer Lines System and other regional assets. The Replacement Values Report". <br />N arterial street lights; Valuation Model" developed improvement portion of the charge is <br />~ <br />U cost per mile for by CH2M Hill. Charges based on current cost of capacity- <br /> off-street bicycle are net of all federal grants enhancing projects to be constructed <br /> paths. and outstanding debt. as contained in the current Capital <br /> Improvement Program. <br />w Level of Service Design flow standards The service standards are seconds Design standards currently use Existing levels <br />~ "D" for roads (675 currently used by the City wastewater treatment by the City to handle afive-year of service for <br />~ peak hour vehicles for various land use types. for flows as defined in MWMC's storm. various <br />~ per lane). One light PFUs are determined operating permit with DEQ, and components, <br />N per 27 peak hour using Oregon State capacity enhancing capital as <br />m VMT. 0.2268 miles Drainage Plumbing Code. improvements as listed in the capital established in <br />~ of off-street bicycle improvements plan adopted the Eugene <br />~ path per 1,000 by the MWMC. Parks and <br />~ people. Recreation <br /> - - Plan. <br />~ Improvement Reimbursement charge The MWMC charge is a combined Improvement charge Improvement <br />~ ~ Charge a 84% reimbursement and improvement fee charge <br />N.c The proportion of the fee that is <br />~,V Improvement charge based on capacity enhancing <br />V o a 16% improvements varies over time as <br /> projects are identified, funded, and <br /> scheduled. <br /> Charges for roads New or expanding Charges for new development, Basic SFD dwelling unit cost is Charges are <br /> and streetli ~ residential uses are changes in use and existing computed based upon assumed ::based on a <br />o would be calculated charged based on a per development connecting for the first 35% impervious area on 9200 flat rate per <br /> based on trip rates dwelling unit cost plus a time are based on the number of square foot lot. For SFDs with dwelling unit <br />= for specific rate per square foot of Flow Estimation Units (PFUs), times 23,000 sq. ft., the cost is based for all types <br />d development types living area. Non-residential the cost per unit of measure. A FEU upon 1.5 times the basic SFD of residential <br />d according to uses are charged based on is based on the size of development, rate. For Duplex development, development. <br />Q. Appendix B, using the number of PFUs at a and the effluent characteristics of the cost is based on 2 times the There is no <br />~ dwelling units, gros rate for the specific flow, biochemical oxygen demand basic SFD rate). The cost charge for <br /> floor area, or other development type and suspended solids for each type for a Manufactured Home Park commercial <br /> units. Trip rates according to Table 4, Page of land use. The charge for changes is computed based on assumed development. <br /> capped at 10 trips C-4. Credit for past trunk in use and expansion of develop- 1,684 sq. ft. of impervious area <br /> per 1,000 square sewer levy payments will be ment already connected to the per leasable space plus the <br /> feet or equivalent. applied to the local charge. wastewater system are based on the additional cost per square foot <br /> net difference in FEUs created by th of all other impervious surface <br /> change or expansion. Credit for pas area. All other development is <br /> property tax payments for debt charged based on actual <br /> service on the regional facilities will impervious surface area or <br /> be deducted from the charge. equivalent <br /> ~~ surface area <br /> <br />Note: Administration costs are not included in the figures above. They will be added to each building permit. The administrative cost is 5.0% of <br />the total SDC (prior to deduction of credit). An additional $10.00 per permit MWMC administrative charge will be added to the MWMC SDC. <br />City of Eugene SDC Methodology Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.