New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-22-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-22-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:49:31 AM
Creation date
6/1/2009 12:09:52 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
2/15/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Multiply the total cost per FEU for a development type by the number of FEUs for a <br />development application. <br />For more detailed and specific numerical data on FEU calculations,'see Table 5. For formula <br />illustrations, see Figure 5 in this Appendix. <br />2.2.1 MWMC Process Wastewater <br />~ he MWMC wastewater SDC for development that discharges process wastewater #o the <br />wastewater system. will be charged on the basis of the strength of that discharge. The <br />rates per. FEU for land uses listed in Attachment 4 of this Appendix include process <br />wastewater charges. For uses not otherwise listed in Attachment 4 that include. process <br />wastewater, the MWMC SDC will be calculated by combining the charge for unit of <br />development for general industrial uses, and adding the charge for the process wastewater <br />FEU that matches the trength of the proposed discharge. The strength classes shown <br />in Attachment 4 are the same strength classes used by MWMC in the user fee system. <br />2.2.2 MWMC Wastewater SDCs For All New Development with Annual Average <br />Daily Flow Equal to or Greater than 900,000 Gallons,.and for Existing Development <br />Increasing Flow by or Greater than 100,000 Gallons per Day <br />Before calculating the SDC for any development-with an anticipated discharge of 100,000 <br />gallons or more of sewage per day, the Executive Officer of the MWMC (EO) shall examine <br />the developments impact on the twenty year schedule of capital projects. If one or more <br />capacity-increasing projects will move into the 5-yearClP as a result of the development, <br />the EO will establish new -unit costs (based on the total costs of the .amended 5-year CIP) <br />upon which SDCs for all development will be calculated. If the MWMC wastewater SDC <br />rate is modified, the modified fee will be applied to the. development that caused the_need <br />for the modification and to all future development. <br /> <br />-- <br />City`of Eugene. SDC Methodology Wastewater, Page C-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.