7.407 (3). <br />7.2.3 Previous Payment or Use <br />In calculating the credits given under this section, the City .Engineer shall apply credit only <br />~ ~ to the developments for which the previous use or payment can be verified.. Credit for <br />previous use will be based on the most. recent documented use except; in the case of <br />redevelopment that will change the use of a building in its entirety., when the credit for <br />previous use will be based on the previous most intense verifiable use per system. In this <br />specific case of redevelopment, the credit calculation will be performed independently for <br />each system which may result in different phases of the use of the site being the basis of <br />comparison. The burden of proof is on the applicant to provide adequate documentation. <br />7.2.3.1 Pre-existing Development Credit <br />When an applicant for development of vacant land establishes that the land was <br />previously improved with .structure(s) which were demolished, a reduction for the <br />demolished structure(s) shall be granted provided a reduction for the demolished <br />structure(s) has not been .previously given. <br />7.2.4 City Cost of Construction Credit <br />In calculating the credits given under section 7.2.1 and 7.2.2, the City Engineer shall <br />estimate the cost of the capital improvement based upon what the City would :pay were <br />' it to construct such improvements. <br />7.2.5 Revenue Collection for Equivalent Assessment or Special Benefit Credit <br />When an equivalent assessment or a special benefit assessment is collected when <br />.property connects to a public improvement for which the City has granted a credit under <br />7.2.2. (3) above, the revenue collected (net of the costs of collection) shall be deposited <br />in .the SDC fund for the system to which connection was made and for which the credit <br />was given unless the SDC fund has been reimbursed for the credit from other City funds. <br />_~. If the SDC fund has been reimbursed in advance from other Cityfunds, the revenue <br />~ ~ :collected will be deposited to the City fund which reimbursed the SDC fund. <br />7.3 Revocation of Credit and Impact Reduction <br />A credit or impact reduction which has been applied to reduce SDC fees may be revoked and <br />he unpaid .portion of the SDC reimposed as a lien against the property, within the time required <br />by these Methodologies, if: <br />(1) The associated capital improvement for which SDC credit has been given is not <br />.constructed or completed as required, or fails to function as designed.; or <br />(2) The associated reduction program for which an impact reduction has been approved is <br />-not instituted or is modified without the approval of the City Engineer,. or. ceases to <br />~ ~ function as designed. <br />Such revocation shall not occur until ten days prior written notice has been given to and an <br />opportunity to be heard afforded the permittee and property owner. If the credit or impact <br />reduction is revoked, the City Manager may add to the amount due, the cost of the revocation <br />City of Eugene SDC Methodology Page 13 <br />