METHODOLOGY: <br />City of Eugene Systems Development Charges <br />Appendix F <br />Fee Schedule and Formulas <br />1.0 Formula and Calculation Details - <br />1.1 General Rate Setting, Cost of Service Formula <br />SDC eligible costs <br />= SDC per unit of service <br />Impact measurement <br />1.2 Transportation System Cost of Service [add cost per trip for: street system ($539.05) + <br />street system lighting ($138.42) + bicycle path system ($68.66) + bicycle path system lighting <br />($8.50) =total cost per trip ($754.63] <br />1.2.1 Street System Cost of Service <br />Miles per trip <br />X Costper lane mile = Cost per trip <br />Capacity per lane mile <br />Calculation <br />0.7665 <br />X $474,701 = $539.05 (pertrip) <br />675 ; <br />1.2.2 Street Light System Cost of Service <br />Formula <br />Miles per trip <br />X Cost per light _ Cost per trip <br />Capacity per lane mile <br />Calculation <br />0.7665, <br />27 <br />X $4,876 = $138.42;,(pertrip) <br />City of Eugene SDC Methodology Fee Schedule. & Formulas,.Page F-1 <br />