New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-01-11-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-01-11-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:16:17 AM
Creation date
6/1/2009 12:09:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
6/29/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.3 Change of Use <br />When a change of use of an existing development results in an increased impact on the regional <br />wastewater facilities (as demonstrated by calculating the SDC for both uses), the SDC will be charged on <br />the increased impact. This is determined by calculating what the development's charge would be for the <br />current use, and for the proposed use. If the proposed use would result in a higher charge, the difference <br />is collected. <br />2.4 MWMC Wastewater SDC Credit <br />A credit for property taxes on real property paid to retire bonded debt incurred for the construction of <br />regional wastewater facilities shall be deducted from the MWMC wastewater SDC. The credit shall accrue <br />from the year of annexation to the City, and be based upon the assessed value of the real property at the <br />time of application for connection to the system. The current credit is shown in Attachment 3. <br />2.5 MWMC Wastewater Administrative Charge <br />A further adjustment to the MWMC wastewater SDC is the addition of administrative costs. MWMC will <br />. incur staff costs for the updating and processing of the charge. These costs are applied on- a per <br />connection basis. The MWMC wastewater administrative charge per permit is applied to the total SDC <br />fees after all other charges and credits have been applied. <br />Attachment 3 <br />Regiona (MWMC) V1/astewater SDC Credit Rates <br />For Fiscal Year 2002 Credit, .effective July 2, 2001 <br />Year of <br />Annexation Credit per $1;000 <br />Assessed Valua Year of <br />Annexation: Credit per $1,000 <br />Assessed Value <br />1979 $4.92 1990 $2.06 <br />1980 $4.83. 1991 $1.64 <br />1981 $4.77 1992 $1.45 <br />1982 $4.64 1993 $1.31 <br />1983 $4.47 4994 $1.13 <br />1984 $4.30 1995 $0.97 <br />1985 $4.09 1996 $0.82 <br />1986 $3.78 1997 $0.63 <br />1987 $3.41 1998 $0.41 <br />1988 $2.98 1999 $0.22 <br />1989 $2.52 2000 $0.04 <br />City of Eugene SDC; Methodology <br />Wastewater, Page. C- 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.