TABLE 2 <br />Potential Impact Reduction and Credits for Systems Development Charges <br />**NOTE: List of possible examples; eligibility depends on compliance with criteria in SDC <br />Policies and Procedures document. <br />1. Transportation S stem - <br />REDUCTIONS: <br />Successful bus pass program for employees <br />CREDITS: <br />Residential <br />Street widths > 36 Feet <br />Commercial/Industrial <br />Street widths > 44 feet <br />Off-site, non-contiguous intersections for arterial and collector streets <br />Transit shelter and pullout <br />Street lights on arterial and collector streets <br />Off-site right of way and easement acquisition <br />Traffic signals <br />Off-street bicycle paths identified in TransPlan or other City plans <br />Offsite ublic im rovements where a uivalent assessments can be collected <br />2. Wastewater S stem <br />CREDITS: <br />Public Wastewater collection lines > 8-inch diameter <br />Public pump stations and pressure lines that serve more than the development. <br />Offsite public sewer improvements, where equivalent assessments can be collected <br />Prior Pa ment of Metro olitan Wastewater Service District debt service <br />3. Stormwater S stem <br />REDUCTIONS: <br />Retention system (e.g. Drywells, infiltration trench) <br />CREDITS: <br />Stormwater collection lines > 24-inch and < 60-inch in diameter <br />Major drainage channels: construction and off-site .easement <br />Offsite public improvements where equivalent assessments can be collected or that benefit <br />existin develo ments <br />4. Parks S stem <br />CREDITS: <br />Land dedication (for sites accepted by City, consistent with adopted City Plans) <br />On-site park facility dedication (for improvements accepted by City, consistent with adopted <br />~ Cit Plans <br />City of Eugene SDC Methodology Page 16 <br />