New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-01-11-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-01-11-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:16:17 AM
Creation date
6/1/2009 12:09:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
6/29/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.4.1 Application for Impact Reduction <br />Applicants must submit their request for an impact reduction in writing, accompanied by <br />the documentation outlined in Appendix D, such as calculations and drawings which <br />support the basic function and design criteria for estimated impact reduction. <br />For commercial development, impact reduction will be applied uniformly for all lots or <br />building sites in the development phase approved. Impact reductions granted under this <br />methodology document may be used in subsequent phases of a development when the <br />applicant demonstrates to the satisfaction of the City Engineer that 'the program or <br />.improvements continue to provide the anticipated reduction in demand, and the City has <br />received assurances or agreements from the developer, owner, and owners successors, <br />as approved by the City Engineer as is necessary to ensure that the program or facility will <br />continue to function. as planned for the agreed upon time period. Changes to the mitigated <br />program or facility attributable to the connection of an additional phase which results in any <br />deviation from the previously determined impact reduction will be adjusted proportionately. <br />7.4.2 Application for Credit Based on Construction of Public Improvements <br />For credits derived from the construction of public improvements, the property owner(s) will <br />be notified in writing about potential credit availability, subsequent to the approval and <br />bonding of the construction plans. The property owner(s) will have 60 days from the date <br />of written notification to submit the SDC Credit Application and complete the approval <br />process as outlined in the SDC Credit Policy and Procedures Manual. Applications that <br />include disbursement instructions for ineligible lots orwhich contain requests in conflict with <br />City code, state law, or current City policies/practices will be considered incomplete <br />applications. <br />7.4.3 Credit Distribution in the Absence of Directions from an Approved SDC <br />Credit Application <br />With the exception of cases where the recovery of credit through an equivalent assessment <br />is uncertain, if the owner does not comply with the requirements of section 7.4.2, the credit <br />will be distributed by the "equal lot" method. All eligible lots or building sites will be <br />identified, and the credit will be distributed in an equal amount to each of these eligible lots <br />or building sites. Credit applied under this policy will not be eligible to be appealed. <br />Development for which a building permit is issued priorto administration of credit disbursal <br />or approval by City staff will not be considered eligible for credit distribution. <br />7.4.4 Changes to An Approved Credit Application <br />Whether established by the City using the "equal lot" method or by the property <br />. owner(s)/applicant(s), any modifications to the distribution of credits may be changed at <br />any time, will require a new completed application, must be approved by the City Engineer, <br />and will be effective only upon approval by the City Engineer of the revised credit <br />..application. The revised distribution will apply only to the remaining credit balances and <br />undeveloped lots or building sites, and must comply with the rules outlined in the SDC <br />Policies and Procedures Manual. <br />City of .Eugene SDC Methodology Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.