New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-01-11-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-01-11-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:16:17 AM
Creation date
6/1/2009 12:09:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
6/29/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SFD and Duplex Residential development: <br />D 100% flat rate stormwater SDC impact reduction for complete containment of <br />all on-site stormwater, with no direct or indirect connection to the public system; <br />or <br />~ 50% flat rate stormwater SDC impact reduction for any amount of partial <br />containment of runoff on-site. <br />Multi-family Residential, Commercial, Industrial, other development using a common <br />or shared facility: <br />~ The stormwater SDC will be reduced in the same proportion that the mitigating <br />facility reduces runoff leaving the fully-developed site. <br />7.2 Credits <br />City approval of credits shall be given based on one or more of the following: <br />7.2.1 Qualified Public Improvement Credit <br />For any qualified public improvement as defined in Eugene Code, to be constructed in <br />connection with the development for which an .SDC is collected. <br />7.2.2 Capital Improvement Credit <br />For any capital improvement as defined in Eugene Code, to be constructed as part of a <br />development to the extent: <br />~ that it reduces the need for construction of specific, identifiable public improvements; <br />or <br />~ that it would otherwise have to be constructed or acquired at public expense and is <br />eligible for funding with Systems Development Charge funds under the current <br />policies of the City Council; <br />or <br />~ that the City can recover credits through collection of an equivalent assessment from <br />benefitted properties, or for which the City Council has formed a Local Improvement <br />District in accordance with provisions in Eugene Code 6.610.(6) or 7.407 (3). <br />7.2.3 Previous Payment. or Use <br />In calculating the credits given under this section, the City Engineer shall apply credit only <br />to the developments for which the previous use or payment can be verified. Credit for <br />previous use will be based on the most recent documented use except, in the case of <br />redevelopment that will change the use of a building in its entirety, when the credit for <br />.previous use will be based on the previous most intense verifiable use per system. In this <br />specific case of redevelopment, the credit calculation will be performed independently for <br />.:each system which may result in different phases of the-use of the site being the basis of <br />comparison. The burden of proof is on the applicant to provide adequate documentation. <br />City of Eugene SDC Methodology Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.