Tree was located in protected natural resource area 20 <br />Attributes that made an area sensitive were damaged during the <br />removal process 10 <br />Removal of tree increased danger of wind fall of other trees 20 <br />Tree provided privacy barrier, wind control, safety barrier, <br />lightlglare shield 10 <br />Tree was located in area with highly erodible or unstable soils 10 <br />Tree provided habitat for threatened, endangered or other protected <br />species 25 <br /> <br />2. Failure to Adhere to or Complete a Condition of a Permit. Each condition of a <br />permit not adhered to or completed constitutes a separate violation. Each day the condition exists <br />beyond the correction time of the Notice of Violation or Notice to Correct constitutes a separate <br />violation. <br />Penalty Calculation <br />((A+C+ E+G) =100), times M x Z where: <br />A =Number of past Tree Preservation violations times 10 <br />C =Cause where, unavoidable accident = 0, negligence =20, intentional =25 <br />E =Effort to correct the violation point total (see Table E) <br />G = Gravity/Magnitude component point total (see Table G) <br />M =maximum. penalty allowed <br />Z = "0" If cause is an unavoidable accident, "1" if cause is negligence or intentional <br />TABLE E: Effort Points <br />Major Effort -Took all steps feasible to correct violation within 0 <br />time frame <br />Moderate Effort -Took some steps to stabilize situation or to 5 <br />correct violation within time frame, additional effort required, <br />gravity and magnitude improved by effort <br />Administrative Order - 12 r:\adminordlrule\OOtreeremlao.wpd(Ol/28/00) <br />