New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-00-13-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-00-13-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 8:57:15 AM
Creation date
6/1/2009 12:08:51 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Construction
Document_Date
9/27/2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
with a pressurized sprayer and shall completely overlap the exiting and new paving to ensure <br />a complete seal of the joint. <br />3.B.3 Geometric Standards for Tvne Two Temporary Surfacing Permits <br />1. Minimum pavement width shall be 17 feet. <br />2. Minimum asphalt concrete pavement depth shall be 4 inches. <br />3 Minimum aggregate base depth shall be 6 inches of 3/4"-0 aggregate <br />4. Maximum slope shall be 20 degrees. <br />3.C INSPECTION <br />Work under the permit is subject to City inspection during and after completion of the work. EC <br />7.305 (3) <br />A copy of the approved permit and drawings must be on the work site. EC 7.305 (2) <br />The Inspector shall be responsible for inspection of work performed under standard right-of--way <br />;' work or cut permits and annual permits for work within the public way. Upon request by the <br />Engineering Division, the Inspector may also inspect other work performed in the public way under <br />a revocable permit or a public improvement permit. <br />Upon receiving the notice of commencement for the proposed work, the Inspector should endeavor <br />to meet with the contractor's representative in charge of the construction at or before the commence- <br />ment of the work covered by the permit. At this time, the methods and planned sequence of the <br />operations should be discussed, unanswered questions resolved, and agreement obtained on <br />preexisting damages to facilities already in place. <br />The Inspector will periodically monitor operations performed by the contractor to see that work is <br />performed according to the permit conditions. The work must strictly conform to .the approved <br />plans. Any changes in the proposed facility from that shown on the approved permit must have the <br />prior consent of the Inspector. If a field change is approved by the Inspector, the permittee shall <br />submit modified permit drawings which document the change. The Inspector may require the <br />permittee to apply for a new permit if the. requested change cannot be resolved by a field decision. <br />EC 7.305 (1) <br />The Inspector may require changes in construction technique or workmanship if hazardous <br />conditions are present and may halt construction if it does not conform to the approved drawings. <br />Utility & R/W Permit Policy <br />EXhlblt A - 29 r:\adminord\rules\OOrowrlexa.wpd(09/13/00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.