New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2007-08 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2007-08 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:21:05 AM
Creation date
6/1/2009 12:08:09 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
MWMC Budget & CIP
Document_Date
7/1/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />BANKSIDE OUTFACE <br />-~-- - A.•rn~l <br />„tea,-,.- n,,,;,r. ,, <br />,. <br />_. __• <br />_ po ~~~° ... <br />f .:,~ ` a ry <br />\ f4a11r1inS, A rwt `/: ~~ .... _ ~ ~ Lam- ~..., <br />• ..._.. _...... .~ r. <br />~~ ..._... -_....._ .. .,.__._ .....____. ..I <br />V , <br />l <br />U __ , <br />,. ~ Gravity 0alt _.: ,, <br />TMicwrnw Fraillty - .. ~.. <br />Pr ~s„~..a..t: '.1 <br />N <br />Project Phasing ~ <br />[ug~aw-cp<ir+nlield Y:Prp~ "~ <br />Description:. Bankside outtall to accommodate 117 mgd (277 mgd less 160 mgd which is the estimated <br />'. capacity of the existing outfall system after secondary treatment modifications). Includes <br /> landscaping in the disturbed area of the outfall as required to mitigate backside <br /> disturbance. <br />Justification: According to the hydraulic calculations in the Facilities Plari, a new bankside outfall will be <br />', required to pass the peak wet weather flow to the river. <br />Project Driver: According to the hydraulic calculation in the Facilities Plan, after secondary treatment <br /> modifications are made, a maximum peak flow of 160 mgd can pass through the existing <br /> outtall box without submerging the secondary clarifier weirs. CH2M Hillis currently re- <br /> evaluating the hydraulics in this area and will provide better clarification of the timing and <br /> need for this project. <br />Project Trigger. Need to provide peak flow capacity in order to treat peak storm flows without overFlow by <br /> 2010. <br />Project Type: 100% Capacity <br /> <br />Estimated Project Cost: <br />j ~ ?? <br />$3,000,000 <br />Expected Cash Flow: FY 08-09 = $1,100,000; FY 09-10 = $1,900,000 <br />Exaenditure/Category: Prior Years 2007-08 2008-09 2009-10 2010-11 2011-12 Total <br />,__ Design/Construction 0 0 $3,000,000 0 0 0 $3,000,000 <br />~ Other 0 0 0 0 0 0 0 <br />Total Cost $0 $0 $3,000,000 $0 $0 $0 $3,000,000 <br />~ Funding Source: Prior Years 2007-08 2008-09 2009-10 2010-11 2011-12 Total <br />Capital Reserve 0 0 $3,000,000 0 0 0 $3,000,000 <br />EPA Grant 0 0 0 0 0 0 0 <br />SDC Reimbursement Reserve 0 0 0 0 0 0 0 <br />r' SDC Improvement Reserve 0 0 0 0 0 0 0 <br />Equipment Replacement Reserve 0 0 0 0 0 0 0 <br />Total Cost $0 $0 $3,000,000 $0 $0 $0 $3,000,000 <br />Page 73 FY 07-08 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.