Metropolitan Wastewater Management Commission Capital Improvement Program <br />BIOCYCLE FARM POPLAR PLANTATION-PHASE 3 <br />f3iosol <br />Facilit <br />Description: Final 120 acres of the Biocycle Farm -site preparation may begin as.early as summer/fall <br /> 2007, however this project may be delayed a year or more dependent on work load <br /> planning and needs of planned planting/harvest cycle. <br />Justification: Land already purchased and provides additional area adjacent to Biosolids Management <br /> .Facility (BMF) for application of liquid and dewatered biosolids. Expansion of the Biocycle <br /> Farm provides Metropolitan Wastewater Management Commission (MWMC) with more <br /> flexibility and control of overall biosolids management program. <br />Project Driver: Increased solids production at the Eugene/Springfield Water Pollution Control Facility (E/S <br /> WPCF). <br />Project Trigger: Biocycle Farm Phases 1 and 2 loading limits for liquid and dewatered biosolids will be <br /> reaching capacity. The planting must fit into the planned cycle of growing and harvesting <br /> of poplars. This project may be delayed a year or more to allow. project management staff <br /> to focus on more critical projects at the treatment plant. <br />Project Type: 100% Performance <br />Estimated Project Cost: $372;000 <br />Expected Cash flow: FY 07-08 = $372,000, however may be delayed until following year. <br />Total Cost $0 $372L000 ~0 $0 $0 $0 $372x000 <br />ExpenditureiCategorv: Prior Years 2001-08 LUUB-Uy 2Ul)9-1U 2U1U-11 2011-12 iotai <br />Design/Construction 0 $372,000 0 0 0 0 $372,000 <br />Other 0 0 0 0 0 0 0 <br />Total Cost $0 $372,000 $0 $0 $0 $0 $372,000 <br />Funding Source: Prior Years 2007-08 2008-09 2009-10 2010-11 2011-12 Total <br />Capital Reserve 0 $372,000 0 0 0 0 $372,000 <br />EPA Grant 0 0 0 0 0 0 0 <br />SDC Reimbursement Reserve 0 0 0 0 0 0 0 <br />SDC Improvement Reserve 0 0 0 0 0 0 0 <br />Equipment Replacement Rese rve 0 0 0 0 0 0 0 <br />Page 49 FY 07-08 BUDGET AND CIP <br />