New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2007-08 MWMC Budget & CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2007-08 MWMC Budget & CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:21:05 AM
Creation date
6/1/2009 12:08:09 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
MWMC Budget & CIP
Document_Date
7/1/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />reached the-end of their useful life after 24 years of operation and must be replaced to maintain <br />the reliability of the process and avoid costly breakdowns. This project and associated funding <br />are included in the Influent Pumping/Headworks Expansion capital project. <br />Roof Replacements -Roofs will be rebuilt on four structures as identified in the above table. All <br />replacements were identified in the course of carrying out our comprehensive roof inspection and <br />testing program. In addition to visual inspections the program includes testing for moisture <br />penetration. Timely replacement avoids more extensive and costly repairs when roof problems <br />are otherwise ignored or delayed. <br />Biosolids Management Facility Road and Parking Lot Repairs -This project entails crack <br />sealing and fog sealing of the entry roadway and parking area. Proper maintenance will extend <br />the life of the asphalt and avoid more costly repairs or replacement. <br />• Major Capital Outlay -Budget <br />None scheduled for FY 07-08. <br />Summary of FY 07-08 Asset Management Capital Budget <br />Cate o of Ca ital Ex ense FY 07-08 Ado ted Bud et <br />Equipment Replacement $486,534 <br />Major Rehabilitation $270,000 <br />Major Capital Outlay $0 <br />TOTAL $756,534 <br />Page 48 FY 07-08 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.