<br /> <br /> <br />ðÎÏÉÕæÜËËÜÏÉÄ <br />ôÏÊÍØÚÉÔÎÏ <br /> <br />The project listed below will satisfy its one year warranty obligation in the next 60 days. <br />Please provide a warranty inspection on the project. <br /> <br />It is the intent of this e-mail to coordinate the inspection efforts of the PWE and PWM <br />staff on all Capitol Improvement Plan (CIP) projects and Privately Engineered Public <br />Improvement (PEPI) projects prior to the expiration of the one year warranty period. In <br />general, the role of the PWM Staff will be to provide expertise, advice, and assistance to <br />the PWE Staff by performing a final inspection of the below listed project within the next <br />four (4) weeks. It is the responsibility of the PWM supervisors to e-mail deficiencies to <br />the inspector initiating this e-mail. It is the responsibility of the inspector to compile all <br />deficiencies and review them with the Construction Manager prior to contacting the <br />prime contractor. If you do not respond to this e-mail within four weeks we will assume <br />you found no deficiencies. <br /> <br />At the time of this request it is the responsibility of the PWE inspector to provide to PWM <br />a usable cover sheet, in a size appropriate to the scope of the project, with the <br /> <br /> <br />The job number is no longer active and is listed as a reference number only. <br /> <br />Responsibility for administering the project and enforcing project requirements remains <br />with the PWE Staff and all communication with the contractor will go through the project <br />inspector who initiated this e-mail or through the PWE Construction Managers. <br /> <br />Please call if you have any questions. <br /> <br />Ö±¾ Ò¿³»æ ÌØÛ ÚßÎÓ ÑÒ ÝßÔ ÇÑËÒÙ ÎÜ <br /> <br />ݱ²¬®¿½¬ ²«³¾»®æ îððèóëðí Ö±¾ Ò«³¾»®æ ìììì <br /> <br />Ѳ» Ç»¿® É¿®®¿²¬§ É·´´ Û¨°·®» Ѳæ éñïïñðç <br /> <br />ݱ²¬®¿½¬±®æ Ü»´¬¿ ½±²­¬®«½¬·±² ½±ò <br /> <br />ײ­°»½¬±® ú и±²» Ò«³¾»®æ ¹´»² ¿ò º»» êèîóëïçë <br /> <br />Ю±¶»½¬ ú Ü»­½®·°¬·±²æ <br /> <br /> Landscape Storm Drain Wastewater Curb & Gutter <br /> Sidewalk HMAC Erosion Control Illumination <br /> Traffic Signals Permanent Signs Permanent Striping <br /> Other <br />Q:\PROJECTS\PROJ-4\4444\Correspondence\Other\4444 20090506 10 MONTH WARRANTY INSPECTION.docx <br />