Run Date: 04/27/2009 13:49:50 City of Eugene <br /> Estimate Distribution <br /> Estimate: ~a£ter the bid opening <br /> Job 93-004598 APT 2009 N RAMP REHAB AT S KILO <br /> Line No. Description- Quantity Unit Unit Price Amount <br /> <br /> 'APT 2009 N RAMP REHAB AT S KILO <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $58,000.00 .:..$58,.000.00 <br /> 0020. EROSION CONTROL 1.00 LUMPSUM $1,500.00 $1,500.00 <br /> 0030. AIRPORT SAFETY AND SECURITY 1.00 LUMPSUM $72,000.00 $72,000.00 <br /> 0040. BARRICADES 15.00 EACH $500.00 $7,500.00 <br /> 0050. 6" TEMPORARY TAPE 200.00 FT $1.50 $300.00 <br /> 0060. UNCLASSIFIED EXCAVATION .2,549.00 CUYD $13.00 $33,137.00 <br /> 0070. GEOTEXTILE FABRIC 6,084.00 SQYD $1.00 $6,084.00 <br /> 0080. SUBBASE COURSE 6" 4,816.00 SQYD $4.00 $19,264.00 <br /> 0090. COLD PLANE REMOVAL 10,236.00 SQYD $1.50 $15,354.00 <br /> 0100. HMAC PRELEVEL 145.00 TON $70.00 $10,150.00 <br /> 0110. HMAC 5,649.00 TON $50.00 $282,450.00 <br /> 0120. SHOULDER FILL AND GRADING 60.00 TON $18.00 $1,080.00 <br /> 0130. ADJUST ELECTRICAL VAULT 3.00 EACH $2,500.00 $7,500.00 <br /> 0140. PAVEMENT MARKINGS 46,279.00 SQFT $0.90 $41,651.10 <br /> 0150. OBLITERATE MARKINGS 659.00 SQFT $5.40 $3,558.60 <br /> 0160. RECESSED PAVEMENT MARKER 9.00 EACH $400.00 $3,600.00 <br /> 0170. SPHP STENCILS 19.00 EACH $200.00 $2,800.00 <br /> 0180. BASE COURSE 12" 1,268.00 SQYD $7.00 $8,876.00 <br /> 0190. CRACK SEALING 2,000.00 FT $2.00 $4,000.00 <br /> 0200. TIE DOWNS 40.00 EACH- $200.00 $8,000.00 <br /> 0210. CLEARING & GRUBBING 1,540.00 SQFT $0.75 $1,155.00 I <br /> Total General $587,959.70- <br /> Total APT 2009 N RAMP REHAB AT S KILO $587,959.70 <br /> APT 2009 N RAMP REHAB AT S KILO - Other / Direct <br /> General <br /> 0010. test 1.00 LUMPSUM $6,000.00 $6,000.00 <br /> 0020. Administration 1.00 LUMPSUM $2,500.00 $2,500.00 <br /> 0030. Printing 1.00 LUMPSUM $1,500.00 $1,500.00 <br /> 0040. street lights 1.00 LUMPSUM $50,000.00 $50,000.00 <br /> Total General $60,000.00 <br /> Total APT 2009 N RAMP REHAB AT S KILO - Other / Direct $60,000.00 <br /> APT 2009 N RAMP REHAB AT S KILO - Miscellaneous <br /> General <br /> 0010._ Engineering Charge 1.00 LUMPSUM $99,000.00 $99,000.00 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $500.00 $500.00 <br /> Total General $99,500.00 <br /> Total APT 2009 N RAMP REHAB AT S KILO - Miscellaneous $99,500.00 <br /> Total after the bid opening $747,459.70 <br /> - _ - _ <br /> <br />