Notification of Commencement and <br /> . Public Works <br /> Completion Dates for Contrac# Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 05/12/09 2008-21 <br /> . PROJECT NAME JOB NO. <br /> PPP 27"' Avenue 4342 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Wildish n/a <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Tom Fahsbender 682-8818 4/25/08 <br /> FIRST NOTIFICATION <br /> 5/8/08 IS THE DATE ON WHICH THE CONTRACTWORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> • COMPLETION <br /> 06/26/08 06/26/08 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 08/06/08 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) • <br /> • . Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period.. <br /> 04/17/091S THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT: THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRSOR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR RRANTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Inspector ignature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File Damon Joyner, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration • PIG Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> O:\PROJECTS\PROJ-2\4342\Correspondence\Contractors\4342 Third Notifica6on.doc <br /> <br /> ~ CY APRIL 2004 . <br /> <br />