New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4433 Beg Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4433 Beg Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 4:44:28 PM
Creation date
5/18/2009 9:28:53 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004433
GL_Project_Number
975564
Identification_Number
Beg Warranty
COE_Contract_Number
2008-00022
Retention_Destruction_Date
4/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> Completion Dates for Contract Projects Eng;neering <br /> -City of Eugene . <br /> 244 E. Broadway. <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 5/12/2009 2008-22 <br /> PROJECT NAME JOB NO. <br /> Barger -Terry 4433 <br /> CONTRACTOR ~ FEDERAL AID PROJECT NO. <br /> V1/ildish n/a <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Dan Ke le 682-5349 5/2//08 <br /> FIRST NOTIFICATION <br /> 5/7/08 IS THE DATE ON WHICH THE.CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED 'COMPLETED & THE TIME CHARGES STOPPED.. <br /> COMPLETION <br /> Na 7/15/08 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 7/31/08 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 04/17/09 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOVUINGTHE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. NUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF G THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY F TS IN WORK THAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHI T ONE- R W NTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OFTHE R <br /> Ins ctor nature <br /> For Privately Engineered Projects Only ' <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File Damon Joyner, PW M <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety P.W Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> ( Q:\PROJECTS\PROJ-314433\Correspondence\Contractors\4433. Second Notification.doc APRI!_ 2ooa <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.