New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4423 Beg Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4423 Beg Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 4:40:08 PM
Creation date
5/18/2009 9:28:52 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004423
GL_Project_Number
975474
Identification_Number
Beg Warranty
COE_Contract_Number
2008-00022
Retention_Destruction_Date
11/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> . Completion Dates for Contract Projects Eng;neering <br /> City of Eugene - <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 882-5560 <br /> DATE CONTRACT NO. <br /> 5/12/2009 2008-22 . <br /> PROJECT NAME JOB NO. <br /> Chad Drive 4423 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> - Wildish n/a <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Dan Ke le 682-5349 5/2//08 <br /> FIRST NOTIFICATION <br /> IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION. <br /> 0 6/11/08 <br /> ALL CLAIMS FOR.ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS:) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 04/17/09 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> .PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DQCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH. SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOW ING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. NUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF ER THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY E CTS IN WOR HAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE-WITH ON EA ARRANTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE R P <br /> t <br /> F f I pecto 'gnature <br /> For: Privately Engineered Projects -Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Constnaction Manager File Damon Joyner, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> O:\PROJECTS\PROJ-3W423\Correspondence\Contractors\4423 Third Notificafion.doc ~n13 APRIL 2004 <br /> <br /> l0 ~ off' ilk, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.