New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4333 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4333 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:16:37 PM
Creation date
5/11/2009 2:09:54 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004333
GL_Project_Number
374333
Identification_Number
2008-00504
Retention_Destruction_Date
4/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> COmp~etlOn ~ateS for. COntraCt PrOJeCtS Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> • Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 5/4/2009 2008-504 <br /> PROJECT NAME JOB NO: <br /> Lone Oaks Subdivision 4333 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Eugene Sand and Gravel <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Karl Kreutzer 682-8466 <br /> FIRST NOTIFICATION <br /> _ <br /> 7/23/07 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspecto ignature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE(S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> WA N/A 5/20/2008 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: WA <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> ~spector ignature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 5%04/2009 IS THE DATE ON WHICH'ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE W ITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> BYTHECONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQU ED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN W , T <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTSMADE WITHIN THE -Y <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAI . <br /> nspe ign <br /> For Privately Engineered Projects Onfy <br /> Engineer: Eugene Sand and Gravel <br /> Address: P.O. Box 1067 <br /> Eugene; OR 97440 <br /> Owner: Dean Schmidt <br /> Address: 2941 Edgewater Dr. <br /> Eugene, OR 97401 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer .Owner Construction Manager~,,~ File Damon Joyner, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor ' MADD Supervisor Inspector <br /> <br /> I C:\Documents and Settings\cewekbklDesktop\4333 20090504KBK Third Notification.doc APRIt_ 2ooa <br /> M~1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.