Final Accep#ance Pubi-cworks <br />Completion of Warranty Period ~ Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541)682-5291 <br />(541) 682-8410 <br />To: Eugene Sand and Gravel <br />3000 N. Delta Hwy <br />Eugene; OR 97440 <br />Project: E. 18th and Agate <br />Contract Number: 2007-26 <br />Date: April 1, 2009 <br />From: Dan Kepley <br />Job Number. 4341,4422, 4442 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects .were noted and/or were corrected. the project is hereby acxepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />arranty <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager <br />y Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br />~. <br />~;: <br />Revised 4/04 <br />