New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4635 PBS3.30.09
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4635 PBS3.30.09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:33:31 PM
Creation date
5/1/2009 1:49:56 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004635
GL_Project_Number
905236
Retention_Destruction_Date
7/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigate Open Waterway R/VU 34L <br /> 3/24/2009 <br /> Estimate GJN 4635 <br /> Push fill into adjacent quarry pits <br /> Unit <br /> Unit Qty Cost Total <br /> mob-10% Is 1 $5,778 $5,778 <br /> <br /> .Safety/Security Is 1 $2,000 $2,000 <br /> Erosion Control Is 1 $2,000 $2,000 <br /> Caterpillar D9 Dozer hr 120 $400 $48,000 <br /> Operator hr 120 $65 $7,800 <br /> $65,578 <br /> contingency 10% 6,557.78 <br /> testing $500 <br /> engineering 15% 9,836.67 <br /> consultant 18,000.00 <br /> TOTAL: $100,472 <br /> Assumptions <br /> 21,000 CY of fill staged <br /> Dozer pushes fill into nearest pond edge <br /> Not purchasing extra fill material <br /> End result is skinnier ponds east to west <br /> No wetland mitigation required <br /> Minimal inpsection needed <br /> Minimal material testing needed . <br /> <br /> Job done in twelve 10 hour days <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.