New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4412 Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4412 Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:47:09 PM
Creation date
5/1/2009 1:49:55 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004412
GL_Project_Number
374412
Identification_Number
5604
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and. <br /> Public Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> Eugene, OR 97401 <br /> ' (541)682-5291 <br /> DATE CONTRACT NO. <br /> 4/21 /2009 2007 - 506 <br /> PROJECT NAME JOB NO. <br /> AERIE PARK SUBDIVISION -SLOPE STABILIZATION'+/- Sta 62+75 RT (+/-70') 4412 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Chris Rowe N/A <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> MICHAEL E. WILSON 541 682-2748 8/27/2008 <br /> FIRST NOTIFICATION <br /> 9/15/2008 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 2/27/2009 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: ~ <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> .THIRD NOTIFICATION <br /> Notice.of Completion. Begin Warranty Period. <br /> 4/02/2009 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3, #4, and #i5> ALL WORK.IS <br /> GUARANTEED BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. <br /> MANUFACTURE WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN <br /> THE REQUIRED ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN <br /> WORK THAT BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR <br /> WARRANTY PERIOD WILL BE REQUIRED~TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEP <br /> A~T,I~,REP ' <br /> /L/~ ? <br /> . Inspecto ignatur <br /> For Privately Engineered Projects Only <br /> Engineer:. Goebel Engineering & Surveying <br /> Address: 310 Gafield.Street <br /> Eugene Oregon 97402 • <br /> Owner: Chris Rowe <br /> Address: 1450 West 7~' Avenue <br /> Eugene, Oregon 97402 _ . _ <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File Ginger Perales, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> \e <br /> Q:\PROJECTS\P.ROJ-2\44121Correspondence\Contractors\4412-20090421 MEWFirst Second Third Notification.doc March 2009 Vr~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.