Final Acceptance Pubrcworks <br /> Completion of Warranty Period ~r,gir,eerit,g <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> (541) 682-8410 <br /> To: EC Company Date: April 22, 2009 <br /> 32758 Old Hwy 34 SE <br /> Albany OR 97321 From: Charles Heath <br /> Project: 2007 Audible Pedestrian Device (ADS) at Various Locations <br /> Contract Number: 2007-22 Job Number: 4453 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specfications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> <br /> . Engineer. <br /> Address: - <br /> Owner. <br /> Address: <br /> Q:\PROJECTS\PROJ-3\4453\Correspondence\Contractors\4453 4212009 Final Acceptance Completion of Warranty Peribd.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br /> ` m <br /> Finance/Accts Receivable fr)r aSSP.SSahIP nrnierts nr Ci4v Racnrrlcrc (l~rc~ fnr nnn~eceec~hln nrninr.+c <br /> <br />