New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4412 Warranty Final
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4412 Warranty Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 10:23:08 AM
Creation date
5/1/2009 1:49:54 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004412
GL_Project_Number
374412
Identification_Number
Fiinal Warranty
COE_Contract_Number
2007-00506
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Acceptance Pubficworks <br /> Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541)682-5291 <br /> (541)682-8410 <br /> To: Delta Sand & Gravel Date: April 24, 2009 <br /> 999 Division Avenue <br /> .Eugene, Oregon 97404. From: Michael E. Wilson <br /> Project: AERIE PARK SUBDIVISION <br /> Contract Number: 2007-506 Job Number. 4412 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted (but for one <br /> location -see. note) by the City for permanent maintenance. <br /> Note: Plan Page #4 Sta B2+75 RT where matting was redone under Correction of <br /> Defective Work letter dated 9/24/2008. This location has a new warranty date starting <br /> 4/22/2009. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. Goebel Engineering & Surveying <br /> Address: 310 Garfield Street <br /> Eugene, Oregon 97402 <br /> Owner: Chris Rowe <br /> Address: 1450 West 7"' Avenue <br /> Eugene, Oregon 97402.. <br /> <br /> Q:\PROJECTS\PROJ-2\4412\Correspondence\Contractors\4412-20090424MEWFinal Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager ~ Revised 4104 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects _'"1 j~~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.