New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4479 4342CO#2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4479 4342CO#2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2011 9:37:30 AM
Creation date
5/1/2009 1:49:53 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004479
GL_Project_Number
975644
Identification_Number
CO #2
COE_Contract_Number
2009-00008
Retention_Destruction_Date
2/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job# 4a7s <br /> Contract# 2009.08 <br /> CONTRACTOR: Eugene Sand Canstrudicn Inc. Change OMer# 2 <br /> (ADDRESS) 3000 N Delta Hwv Date: 02!18/08 <br /> <br /> ' ~ PO Box 1067 CAMS Data: <br /> Eugene, OR 97440 ' <br /> Rev(ewed by: Date: <br /> PROJECT: 2008 Pavement Preservation Program Roosevelt Boulevard from Beltline InspeGor. M Koivula <br /> _Highway to Chambers Connector (Federal A(d Project #XSTP-2385 (068)) - K Manvilz oR <br /> Pro). Mgr. M. Rodrigues __C~~tt%_.. <br /> Principal Eng. P. Klope ~ <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> Item <br /> No. <br /> 381 Contractor dela etl while the C' determined'd subm(ttals for conduit had been submitted and a roved <br /> ' 382 Remove curb sidewalk and AC subbase install conduit and re lace curb and sidewalk, 2 locations at NE comer Hi hwa 99 and Roosevelt Bivd. <br /> 393 Excavate locate exis[in dame ed conduits and evaluate for feaslblll of re afr 3 options near Maintenance Yard entrance at Roosevelt Blvd <br /> station 151+00 a roximate <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Ite Time Quantity- Unit Amended Net <br /> No. Item Chan a Units Cost Amount (+1-) Chan a Chan e <br /> 381 contractor deiayetl for conduit installation Orl inal 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended .1.00 LS. $138.24 $136.24 $138.24 <br /> 382 Remove old subbase AC, install conduit below and Ori final 0.00 .0.00 0.00 $0.00 <br /> replace surfadng at Highway 99 and Roosevelt Revised 0.00 .W O.OD <br /> Northeast comer 2 !options Amended 1.00 LS $4,234.16 $4234.16 $4,234.16- <br /> 383 Flnd and repair conduits for "counter bops" for O Ina! 0.00 0.00 0.00 $0.00 <br /> 3 !options near City Maintenance yard entry Revised 0.00 .00 0.00 <br /> conduit damaged by others Amended .1.00 LS $1,801.51 $1801.51 $1801.51 ' <br /> Orl final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 .DD 0.00 <br /> Amended 0.00 $0.00 <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00. $0.00 $0.00 $0.00 <br /> Orl final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 $0.00 $0.00 $0.00 <br /> The original contract work days are o.o da s <br /> The contract time change this C.O o.o da s <br /> The contract time change by previous C.O.'s o.o da s <br /> • The new contract work da s are o.o da s <br /> The original contract sum was $1s77.1a7.a5 . <br /> Net change by previous change order <br /> $o.oo. <br /> Net change due to amendment by previous change order $77,71s.a3 <br /> The contract sum prior to this change order was <br /> $1.754.857.68 <br /> This change order will change contract sum by this amount $s,n3s1 <br /> The new contrail net change sum 30.00 <br /> The new contrail amendment sum $a3,693.7a <br /> The new contract sum including this change order will be $1,7s1,o3tss <br /> Percenta a of on final contract s.oo% <br /> NET CHANGE DUE TO AMENDMENTS ~ 5.00% <br /> Approv by: <br /> City ngineer Prime Contractor Third Party <br /> ,~/G~~y <br /> Date Date Date <br /> ? CONTRACTOR ? OFFICE FILE ? PURCHASINGICRO <br /> O\FORMS\PROJEC'r~CONSTUtEVISED CHANGE ORDER.XLS <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.