concrete curb and gutter, and asphalt concrete paving, resurfacing work will be paid for according <br /> to 00745.90 and 00759.90 as applicable. Resurfacing shall be in accordance with project plans and <br /> specifications, and the City of Eugene Publication, "Utility and Right-of--Way Permits . <br /> Construction Within-and Use of the Public Way". <br /> CHANGES TO PLAN SHEETS: <br /> (DELETE) Plan sheets 4425-D03, 4434-COS, 4434-C06, 4434-C07, 4502-D03, 4502-CO1, 4502-C02, 4502- <br /> STO1, 4502-ST02". <br /> (ADD) Revised plan sheets 4425-D03, 4434-COS, 4434-C06, 4434-C07,4502-D03, 4502-COl, 4502- <br /> C02, 4502-STO1, 4502-ST02. <br /> (ADD) New. plan sheet 4502-D04. <br /> If you have questions about this addendum or the project, please call Matt Rodrigues at (541) 682-6036. <br /> All bidders shall acknowledge the receipt of and'acceptance of this Addendum No. 1 by signing and submitting the <br /> signed Addendum with the bid.. Bids submitted without this Addendum, or with the Addendum not signed, will be <br /> considered informal <br /> Mark c oening, <br /> City Engineer <br /> Receipt acknowledged and conditions agreed _ . <br /> <br /> this 30 day of MARCH , 2009. <br /> <br /> Bidder• WILDISH COT STRU TION CO. <br /> <br /> By: <br /> <br /> Addendum #1 -Jobs #4425, 4434, & 4502 Page 's <br /> <br />