New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4502 Contract 2009-19
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN 4502 Contract 2009-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2011 2:09:42 PM
Creation date
4/29/2009 4:42:13 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004502
GL_Project_Number
985084
COE_Contract_Number
2009-00019
Retention_Destruction_Date
5/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' CITY OF EUGENE <br /> PROPOSAL <br /> APRIL 2, 2009, 2:00- P.M. JOB #4425, 4434, 4502 BID NUMBER 7 <br /> TO THE CITY MANAGER BIDDER: WILDISH CONSTRUCTION co. <br /> EUGENE, OREGON <br /> The. undersigned Bidder declares: <br /> . That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br /> iri the Book of Contract.Documents and Specifications for this job which includes but is not limited to the Plans; City <br /> Standard Specif cations and Standard Drawings, Supplemental Specifications and Special Provisions; and City of Eugene <br /> Amendment #1, Addenda,. Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br /> 2009 PAVEMENT PRESERVATION PROGRAM <br /> COUNTRY CLUB RD FROM WILLAGILLESPIE TO SOUTHWOOD LN -JOB #4425 <br /> FOX HOLLOW RD FROM EAST AMAZON DR TO DONALD ST JOB #4434 <br /> CRESCENT AVE FROM SHADOW VIEW DR TO COBURG RD -JOB #4502 <br /> CAPITAL IMPROVEMENT PROJECT <br /> That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br /> necessary to determine the character of the material and the conditions to be encountered, independently of the indication <br /> on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br /> Form, will to the extent of this bid, provide the necessary machinery, tools, apparatus, and other means of construction; <br /> and will fiunish all material and labor as specified, or called for by the flans or necessary to cornplete the work in the <br /> manner specified and in accordance with the requirements of the Engineer. <br /> 'The undersigned also agrees that Bidder will order all material and equipment included under this contract and <br /> <br /> will commence work within five (5) days after receipt of Notice to Proceed and that Bidder will complete,the work in all <br /> respects after commencement and will have the project completed WITHIN. TWENTY EIGHT (28) WORK DAYS <br /> ANDALL-WORK COMPLETED BY JULY 31, 2009 FOR JOB #4425 TWENTY EIGHT WORK DAYS AND <br /> ALL WORK. COMPLETED BY JULY 31, 2009 FOR JOS. #4434 TWENTY-FOUR WORK DAYS AND ALL <br /> <br /> WORK COMPLETED BY JULY 31, 2009 FOR JOB #4502 and that Bidder will pay as liquidated damages to the . <br /> City for any. delay, the sum of FOUR HUNDRED DOLLARS ($400.001 per day for each day required beyond that <br /> <br /> period. <br /> PROPOSAL -JOB #'s 4425, 4434, 4502 PAGE 1 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.