City of Eugene <br /> Re: West Bank Trail EMension <br /> April 8, 2009 <br /> Page 3 <br /> a reviewlopinion of legal instruments such as indemnification agreements, purchase and sale <br /> agreements, liens, etc. Its cursory nature is to be noted by all parties. <br /> The scope of work for the project does not address many potentially significant environmental issues, <br /> including: hazardous materials audit, environmental compliance; indoor air quality (such as vapor <br /> intrusion), mold or radon; asbestos-containing building materials, lead-based paint, wetlands and other <br /> land use issues, geotechnical or geologic hazards, nor does it include subsurface exploration or <br /> chemical screening of soil and groundwater beneath the site which is rieeded to determine site <br /> contamination with scientific certainty. <br /> PBS will utilize a commercial database search provider in the conduct of this project. Their.report is <br /> subject to the limitations, constraints, inaccuracies and incompleteness of government information and <br /> of computer mapping data and conventions. <br /> The findings and conclusions of this report are not scientific certainties, but rather probabilities based <br /> on professional judgement concerning the significance of the data gathered during the course of the <br /> study. PBS is not able to represent that the subject property or adjoining land contain no hazardous <br /> waste, oil or other latent condition beyond that detected or observed by PBS during the study. The <br /> possibility always exists for contaminants to migrate undetected through surface water, air or <br /> groundwater. The ability to accurately address the environmental risk associated with transport irrthese <br /> media is beyond the scope of this study. <br /> FEES: <br /> Labor: <br /> Geologist (Project)(40 hrs @ $90) $ 3,600 <br /> Drafting Geologist (CAD Design)(4hrs @ $70/hr) 280 <br /> Administrative Support (Clerical)(4 hrs @ $55/hr) 220 <br /> Expenses: <br /> EDR Data base report 400 <br /> Aerial Photos 200 <br /> Copies, postage, mileage, etc 200 <br /> Total $5,000 <br /> The cost of reproduction, disposable equipment, mileage and postage are included in the above <br /> estimated fee. Four hardcopies and an electronic copy of the final report will be provided. <br /> The indicated fee and the terms under which our services are provided will be in accordance with the <br /> attached City of Eugene Terms and Conditions as specified in PBS' retainer contract with the City of <br /> Eugene for engineering and environmental services, and may not be changed without the prior written <br /> consent of the parties. <br /> <br /> The data and information contained in this document are proprietary and shall not be duplicated, used <br /> or disclosed in whole or in part to other parties without PBS' permission. <br /> <br />