<br /> Run Date: 03/12/2009 09:41:24 City of Eugene
<br /> Estimate Distribution
<br /> Estimate: ost-Bid Estimate
<br /> Job 9Ci~-~ZSTEWATER REHAB BASIN DW36, DA31, DA42. DA43
<br /> Line No. Description Quantity Unit Unit Price Amount
<br /> 2009 WASTEWATER REHAB BASIN DW36, DA31, DA42, DA43 -
<br /> General
<br /> 0010. .MOBILIZATION 1.00 LUMPSUM $11,400.00 $11,400.00
<br /> 0020. TEMP PROTECTN/DIRECTN" 1.00 LUMPSUM $5,000.00 $b,000.00
<br /> 0030. EROSION CONTROL 1.00 LUMPSUM $210.00 $210.00
<br /> 0040. FLAGGING 40.00 HOUR $45.00 $1,800.00 '
<br /> 0050. LANDSCAPE 1.00 LUMPSUM $12,000.00 $12,000.00
<br /> 0060. TREE PROTECTION FENCING 520.00 FOOT $2.10 $1,092.00.
<br /> 0070. TREE PROTECTION ROOT ZONE EXCAVATION 7.00 EACH $1,500.00 $10,500.00
<br /> 0080. REMOVE TREE 1.00 EACH $315.00 $315.00
<br /> 0090. AC COLD PATCH ~ 1,000.00 SQFT $4.25 $4,250.00
<br /> 0100. AC, VARIOUS DEPTHS 56.00 TON $300.00 $16,800.00
<br /> 0110. CONCRETE 4° 1,640.00 SQFT $6.35 $10,414.00
<br /> 0120. CONCRETE 5" 650.00 SQFT $7.00 $4,550.00
<br /> 0130. CONCRETE 7" 240.00 SQFT $8.00 $1,920.00
<br /> 0140. INSTALL TRUNCATED DOME SURFACE 50.00 SQFT $24.00 $1,200.00
<br /> 0150. REM. AND REP. CONC. CURB AND GUTTER 250.00 FT $50.00 $12,500.00
<br /> 0160. ABANDON PIPE IN PLACE 1.00 EACH $3,000.00 $3,000.00
<br /> 0170. SEWER PIPE CIPP 8" 4,516.00 FT $23.00 $103,868.00
<br /> 0180. SEWER PIPE CIPP 10° 1,148.00 FT $24.00 $27,552.00
<br /> 019.0. SEWER PIPE CIPP 12" 331.00 FT $33.00 $10,923.00
<br /> 0200. SEWER PIPE CIPP 18" 400.00 FT $53.00 $21,200.00
<br /> 0210. SEWER PIPE CIPP 21° 659.00 FT $54.00 $35,586.00
<br /> 0220. SEWER PIPE CIPP 24" 392.00 FT $78.00 $30,576.00
<br /> 0230. POINT REPAIR 8" 20.00 FT $254.00 $5,080.00
<br /> 0240. SEWER PIPE 4"/ 6" HDPE, PIPE BURST SVC 285.00 FT $20.00 $5,700.00
<br /> 0250. POINT REPAIR 18" 18.00 FT $300.00 $5,400.00
<br /> 0260. CONSTRUCT 4"/ 6" PVC WASTEWATER PIPE 780.00 FT $75.00 $58,500.00
<br /> 0270. CONSTRUCT 4"/ 6" PVC SERVICE CONNECTION 70.00 EACH $1,050.00 $73,500.00
<br /> 0280. CONSTRUCT INTERNAL SERVICE CONNECTION 4.00 EACH $232.00 $928.00
<br /> 0290. GROUT SEAL SVC CONNECTION 4.00 EACH $238.65 $954.60
<br /> 0300. CONSTRUCT 6" PVC SADDLE CONNECTION 14.00 EACH $1,100.00 $15,400.00
<br /> 0310. CONNECT PIPE TO EXISTING MANHOLE 3.00 EACH $765.00 $2,295.00
<br /> 0320. ~ MINOR ADJUSTMENT OF MANHOLES 3.00 EACH $185.00 $555.00
<br /> 0330. REM/REPL MH LID W/WATER TIGHT LID - WW 4.00 EACH $965.00 $3,860.00
<br /> 0340. CLEANOUT 8 INCH 1.00 EACH $410.00 $410.00
<br /> 0350. PLUG PIPE IN MH 2.00 EACH $305.00 $610.00
<br /> 0360. POT HOLE SVC/REPAIRS 3.00 EACH $1,200.00 $3,600.00
<br /> 0370. MAJOR VERIFICATION 1.00 EACH $420.00 $420.00
<br /> 0380. DYE TEST AND CONNECTION VERIFICATION 26.00 EACH $140.00 $3,640.00
<br /> 0390. TV INSPECT & LOCATE SERVICE LINE 7.00 EACH $560.00 $3,920.00
<br /> 0400. TV INSPECTION, CLEANING PRE & POST 1.00 LUMPSUM $18,000.00 $18,000.00
<br /> Total General $529,428.60
<br /> Total 2009 WASTEWATER REHAB BASIN DW36, DA31, DA42, DA43 $529,428.60
<br /> 2009 WASTEWATER REHAB BASIN DW36, DA31, DA42, DA43 - Other / Direct
<br /> General
<br /> 0010. test 1.00 LUMPSUM $2,000.00 $2,000.00
<br /> 0020, Contingency 10~ of Contract $52,942.86
<br /> 0030. Advertising 1.00 LUMPSUM $250.00 $250.00
<br /> 0040. Printing 1.00 LUMPSUM $350.00 $350.00
<br /> Total General $55,542.86
<br /> Total 2009 WASTEWATER REHAB BASIN DW36, DA31, DA42, DA43 - Other / Direct $55,542.86
<br />
<br />
|