CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job# 4a7s <br /> Contract # 2009-03 <br /> CONTRACTOR: Eugene Sand Construc0on Inc. Change Order # 2 <br /> (ADDRESS) 3000 N Delta Hwy Date: 02/18/08 <br /> - PO Box 1067 CAMS Date: <br /> <br /> ' _Eugene, OR 9744D <br /> Reviewed b . Date: <br /> PROJECT: 2008 Pavement Preservation Program Roosevelt Boulevard from Beltline Ins_aedor. M Kolvula <br /> Highway to Chambers Connector (Federal Aid Project #X-STP-2385 (058)) K. Marwitz f: <br /> 0~ <br /> Proj. Mgr. M. Rodd ues iL <br /> Pdncipal Eng. P. Klooe <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> item <br /> No. <br /> 361 Contractor dela ed while the Ci determined if submittals for conduit had been submitted and a roved <br /> 382 Remove curb sidewalk and AC subbase install conduit and re lace curb and sidewalk, 21oca0ons at NE comer Hi hwa 99 and Roosevelt Bivd. <br /> 383 Excavate locate exisOn dama ed conduts and evaluate for feasl6lli of re air 3 bcadons near C Maintenance Yard entrance at Roosevelt Blvd <br /> station 151+pp a roximate <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Chan a Units Cost Amount Chan a Change <br /> 381 contractor delayed for conduit installation Orl final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 138.24 $138.24 $138.24 <br /> 362 Remove old subbase AC, install mnduit below and Ori final 0.00 0.00 0.00 $D.00 <br /> replace surfadng at Highway 99 and Roosevelt Revised. 0.00 0.00 0.00 <br /> Northeast amer 2 locations Amended 1.00 LS $4 234.16 $4,234.16 $4,234.16 <br /> 383 Flnd and repair conduits for "counter loops" for Ori final 0.00 0.00 .00 $D.00 <br /> 3 locations near City Maintenance yard entry Revised 0.00 .00 0.00 <br /> conduit damaged by others Amended 1.00 LS $1,801.51 $1801.51 $1801.51 <br /> Ori Inal 0.00 D.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended $0.00 $0.00 <br /> Orl final 0.00 0.00 0.00 $0.00 <br /> ' Revised 0.00 0.00 0.00 <br /> Amended 0.00 $0.00 $0.00 $0.00 <br /> Orl lnal 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0,00 <br /> Amended o.oo $o.oo $D.oo $o.oo <br /> The original contract work days are o.o da s <br /> The contract time change this C.O o.o da s <br /> The contract time change by. previous C.O.'s o.o da s <br /> The new contract work da s are o.o da s <br /> The original contrail sum was <br /> Net change by previous change order s1.s77,1$0.00 <br /> Net change due to amendment by previous change order $n,71 ss3 <br /> The contract sum prior to this change order was . $.1,754,957ss <br /> This change order will change contract sum by this amount ...............____._„_______m.___...,.,.~,,,,,,,.,.,,.,,,, gs.173:s1 <br /> The new contract net change sum <br /> so.oo <br /> The new contract amendment sum ~ ~ sa3,as3.7a <br /> The new contract sum inGuding this change order will be $1,7s1,o3t ss <br /> Percenta a of on final contract ~ 5.00% <br /> NET CHANGE DUE TO AMENDMENTS ~ 5.00% <br /> Approv by: <br /> City ngineer Prime Contractor. Third Party <br /> .~/G~Gy <br /> Date Date Date <br /> ? CONTRACTOR ? OFFICE FILE ? PURCHASINGICRO <br /> Q\FORMSIPROJECTICONST\REVISED CHANGE ORDER.XLS <br /> <br />