Final Acceptance Fub~icworks <br /> .Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> (541) 682-8410 <br /> To: .Knife River Date: March 2, 2009 <br /> 1001 Division Ave. <br /> Eugene, OR 97404 From: Dan Kepley - 682-5349 <br /> Project: 18t"and Bailey Hill <br /> Contract Number: 2007-27 Job Number: 4421 and 4345 <br /> A warranty inspection has been made on this project in accordance with Section .00150 of the <br /> City Standard Specifications and Standard Drawings.. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> .Address: <br /> Owner. <br /> Address: <br /> Q:\PROJECTS\PROJ-1\4421\Correspondence\Contractors\Final Acceptance Completion of Warranty Period;doc <br /> <br /> r ENG 1122 Contractor -File Engineer Owner . Surety PW Admin Construction Manager Revised 4104 <br /> <br />