Final Acceptance Fubl?cworks <br /> <br /> Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> ' Eugene, OR 97401 <br /> (541)682-5291 <br /> (541) 682-8410. <br /> To: Wildish Constnaction Date: March 40, 2009 <br /> PO Box 7428 <br /> Eugene, OR 97401 From:. Charley Perini <br /> .Project: Turnberry Subdivision <br /> Contract Number: 2007-505 Jdb Number.. 4403 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects. were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. Branch Engineering <br /> Address: 310 Fifth St <br /> Springfield, OR 97477 <br /> Owner: Tom Walker <br /> Address: 2863 Riverwalk Loop <br /> Eugene, OR 97401 <br /> Q:\PROJECTS\PROJ-3\4403\Correspondence\Contractors\4403-20090310Fina1 Acceptance Completion of Warranty Period.doc <br /> ENG 1122 _ Contractor File Engineer Owner Surety 'PW Admin Construction Manager Revised 4/04 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable,projects <br /> <br />