AFFIDAVIT OF PUBLICATION <br /> P.O. Box 10127 !Portland, Oregon 97296.0127 / (503)226-1311 FAX (SD3) 222.5358 <br /> - - -STATE OF OREGON, COUNTY OF MULTNOMAH, --ss. - - - <br /> t, MARC CAPLAN, being first duly sworn, depose and say that I am a Manager of the DAILY JOURNAL OF COMMERCE, a <br /> newspaper of general circulation in the counties of CLACKAMAS, MULTNOMAH and WASHINGTON as defined by ORS <br /> 193.010 and 193.020; published at Portland in the aforesaid County and State; that I know from rnypersonal knowledge that , <br /> the <br /> CALL FOR BIDS <br /> CITY OF EUGENE, OR - 2009 WASTWATER REHABILITATION <br /> a printed copy of which is attached, was published in the entire issue of this newspaper for 1 time(s) in the following issues: <br /> CITY OF EUGENE, OREGON. ' <br /> 01~29~2009. 2009WASTEWATER REHABIUTATiON <br /> Bide due 2:09' m, Fab. 17 <br /> CALL FOR BIDS <br /> 'Notice fa hereby given that the-City <br /> Couridl of the Citybf EuyArre: OragonwiN <br /> receive sealed bids Until Tuesday, Febru- <br /> • ary 17 2099;'untlt-the 81d Closing tlme of <br /> Subscribed and sworn to before me this 30th day 2:00 P m at-the'offlce of the city. Ertg(naer, <br /> 99 East Broadway Suite 400, Eugene, Or- , <br /> of January, 2009. egon; The Bid OpeNng will be aT2:05 <br /> ' p.m.,.on'Nasday, February 17,2009, at' <br /> 'the above lopadon, at whk;h tlme and place <br /> those Bids _ II be opened and-read, <br /> Job 4567•''1009 WASTEWATER REHA- <br /> BILITATIQN <br /> Bases DW 38, DA 31, DA 42 and DA 43. <br /> Pro)ect i3ztends from' W. 23rd Avenue <br /> south to Larch. Street, and froth Friendly <br /> OFFICIAL SEAL Street east to Skyline Park Loupp (4,294 FT <br /> SANDRA L MOAT 8° CIPP Uner, 1,148 FT 10" CIPA Liner; <br /> NOTARY PUBLIC•OREGON 400 FT 18"CIPP Liner; 659 FT of 21° <br /> CIPP Uner; 392 F424"CIPP Unet; 745 FT <br /> .~4•, COMMISSION NO. 412569 4" & 6' PVC Wastewater Service Pipe; 285 <br /> (rtfICNDO~IRESDEC7 2010 FT HDPE.PIpe Bursting of Services; 45 TN <br /> of HMAC Trench Patching alt Depths; <br /> 1,540 SF 4° Concrete; Miscellaneous Curb <br /> & Gutter; Driveway & Sidewalk Aeplace- <br /> ment; Trefflc Control; Erosion Control & <br /> Other Miscellaneous Appurtenances). <br /> All work shall be completed by July 3, <br /> 2009. <br /> PRE-BFD MEETING: All Interested.par- <br /> tles are invited to attend anon-mandatory <br /> pre-bid meeting to be held on Tuesday, . <br /> February 10, 2009, at 1.0:00 a.m. in the <br /> Lyle Conference Room, 99 E. Broadway <br /> Suite 400, Eugene, Oregon. <br /> .Plans and specifica[tOns may be re- <br /> viewod and7or obtained at the office of the <br /> Ciry Engineer, 99 East 13rbadwaY Eugene, <br /> Oregon 97401, for anon-retundaNe'fee of <br /> $15.OO.plus $6.50 pcstege. Fop other re- <br /> viawing locations and any questions re- <br /> 682 SSBOh orpusee otu~lEnyineering561d <br /> Websita www.eugene•ocgpv/PW to review <br /> Plans and Spedflcatiana. <br /> Bids shelf be accempahled by"a certified <br /> check, cashier's ohedt or bidder's bond . <br /> payable to the City of Euggene in an <br /> ' amount equaito ten. percent of the amount <br /> ' CITY OF EUGENE-ENGINEERING bid. Filing o(a qualiflcetlon questlonnatre <br /> LYNN BROGDEN before bidding <br /> will not be ret~utred;Contin- <br /> geM oror con-~tional 6lds <br /> wIA not be corisid• <br /> 244 E. BROADWAY erect for acceptance: This public works Jm- <br /> EUGENE, OR 97401 provemem project;la sub)ect w payment of <br /> prevailing rate of wages, per.BOLI.ORS <br /> 2790.600 to.279C.870. NO bid witl.ba ie- <br /> c~lved 4r considered unless the bid c.on- <br /> telnsa staternenf by thebldder ih8t provi-: <br /> , stone of ORS 2790.800 to 279C.t370 per.- <br /> talningg to prevailing wage retes shell be <br /> xamPlied wNh{ . <br /> Bidders are required to. submit a <br /> Flrst-Tier Subcontractor Disclosure form, <br /> substantlalty as described in ORS • <br /> 2790.370, prior to the Bid Closing Date <br /> and Time. For this prp)ect the first-tlar sub <br /> contractor discbsure statement must be <br /> submitted regardless of the bid amount <br /> No bid .will be accepted by the City <br /> <br /> ' - unless it contains a statement by the bid- , <br /> der as apart of the bid that the bidder In . <br /> carrying out the contract will comply with <br /> all applicable laws. <br /> The' Ciry may reject am bid not t~ <br /> <br />