Final Acceptance Pubr~works <br /> Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> (541) 682-841'0 <br /> To: Oregon Excavating, Inc. Date: March 27, 2009 <br /> 29322 Airport Road . <br /> Eugene, OR 97402 From: Karl Kreutzer <br /> Project: Tel Estates <br /> Contract Number: 2007-524 Job Number: 4469 <br /> A warranty inspection has been. made on this project in accordance with Section 00150 of the <br /> City Standard Specfications and Standard Drawings. <br /> No defects were noted and/or were corrected. with the exception of CB #83936, 83932, <br /> 83939, 83940, 83943. and 83949 which will be covered- under a new warranty period <br /> (3/27/2009 - 3/27/2010), the project is hereby accepted by the: City for permanent <br /> maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. Weber Elliot Engineers, P.C. <br /> Address: P.O. Box 10145 ' <br /> Eugene, OR 97440 <br /> Owner. Paul Lemmon <br /> Address: 5580 Barger Drive <br /> Eugene, OR 97402 <br /> Q:\PROJECTS\PROJ-9\4469\Correspondence\Contractors\4469-20090327Final Acceptance Completion of Warranty PeriodKBK.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br /> <br /> ~ Finance/Accts Receivable forassessable projects or City Recorders Office for nonassessable projects rn <br /> <br />