I <br /> • f <br /> i <br /> ; <br /> EXHIBIT "A" <br /> : ~ CITY•4F EUGENE (PR~Dj <br /> • ~ SPECIAL ASSESSMENT SYSTEM ~ <br /> • <br /> 93004527 - ASSM:BTH ALLEY TYLER TO POLK ~ ~ ~ <br /> •PROJECT LEGAL: CONCRETE ALLEY PAVING, AND CONSTRUCTZNG WASTEWATER ANA STORMWATER SYSTEMS ON 6TH <br /> ALLEY BETWEEN TYLER STREET AND POLK STREET <br /> CONTRACT NUMBER: 2008-00028 ? <br /> JOB NUMBER: 93004527 <br /> i <br /> i <br /> ASSESSABLE: <br /> 12 PENDING $120,676.70 <br /> 0 flN HOLD $0.00 ' <br /> . I <br /> 0 LIEN DEFERRED $0.00 <br /> • ASSESSABLE TOTALS: 12 $120,676.70 <br /> CITY SHARE: I <br /> <br /> • CITY SANITARY $49,957.72 f~ <br /> CITY STORM $5,510.38 ; <br /> 1 <br /> CITY SfIARB TOTALS: $55,468.10 <br /> TOTAL CO5T OF PROJECT: $176,144.80 <br /> I~ <br /> f <br /> • <br /> I- <br /> _ I <br /> f <br /> i <br /> i <br /> 1 <br /> • t <br /> <br />