<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 006
<br /> Contractor: WILDISH CONSTRUCTION Original Contract: $830,561,65
<br /> Job 93-004346 Current Amount: .$867,645.40
<br /> Contract No: 2008-00021 Contract Award Date: 04/25/2008
<br /> PO 2008100412 Completion Date: 06/26/2008
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals ~ Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount
<br /> 0040 FLAGGERS $40.00 HOUR 750.000
<br /> $30,000.00 0.000 $0.00 900.500 $36,020.00 120.00
<br /> 0050 EROSION CONTROL $2,000.00 LUMPSUM 1.000
<br /> $z,ooo.oo o.oao $o.oo l.oaD $z,ooo.ao loo.oo
<br /> 0060 SURFACING STABILIZATION $85.00 CUYD 548.000
<br /> $46,580.00 0.000 $0.00 505.700 $42,984.50 92.00
<br /> 0070 CITY PROVIDED SPEC INFO SIGNS $150.00 EACH 4.000
<br /> $600.00 0.000 $0.00 4.000 $600.00 100.00
<br /> 0080 ADJUSTING BOXES $250.00 EACH 4.000
<br /> $1,000.00 0.000 $0.00 3.000 $750.00 75.00
<br /> 0090 MINOR ADJUSTMENT OF MANHOLES $1,250.00 EACH 9.000. $11,250.00 0.000 $0.00 13:000 $16,250.00 144.00
<br /> 0100 MH RSM/REPL FRAME/COVER-WW $300.00 EACH 2.000 II
<br /> $600.00 0.000 $0.00 6.000 $1,800.00 300.00
<br /> 0110 MH REM/REPL FRAME/COVER-ST $300.00 EACH 7.000 $0.00 6.000 I
<br /> $2,100.00 0.000 $1;800.00 86.00 i
<br /> 0120 COLD PLANE PVMT REMOVAL, 2" D $0.23 SQFT 153,350.000
<br /> $35,270.50 U.000 $0.00 183,285.000 $42,155.55 120.00
<br /> 0130 COLD PLANE PVMT REMOVAL, TAPER $0.20 SQFT 38,710.000
<br /> $7,742.00 0.000 $0.00 56,807.000 $11,361.40 147.00
<br /> 0140 COLD PLANS PVMT REMOVAL, TAPER $1.16 SQFT 4,290.000 ~
<br /> $4,976.40 0.000 $0.00 11,200.000 $12,992.00 261.00
<br /> 0150 LEVEL 3, 1/2" DENSE HMAC $53.00 TON 5,440.000 $288,320.00 0.000
<br /> $0.00 5,809.420 $307,899.26 M 107.00 ~
<br /> 0151 LEVEL 3, 1/2" HMAC PRICE ADJ-M 001 $2.30 TON 4,151.570
<br /> $9,548.61 0.000 $0.00 4,151.570 $9,548.61 100.00
<br /> 0152 LEVEL 3, 1/2" HMAC PRICE ADJ-J 001 $4.53 TON 1,657.850
<br /> $7,510.06 0.000 $0.00 1,657.850 $7,510.06 100.00
<br /> 0160 PVMT LEGEND, TYPE A2 or B: ARR $115.00 EACH 36.000
<br /> $4,140.00 0.000 $0.00 38.000 $4,370.00 106.00
<br />
<br /> 0170 PVMT LEGEND, TYPE A2 or B: BIC $150.00 EACH 9.000
<br /> .$1,350.00 0.000 $0.00 9.000 $1,350.00 100.00
<br />
<br /> 0180 PVMT LINE, TYPE A2 or B $4.00 SQFT 1,445.000
<br /> $5,780.00 0.000 $0.00 1,628.000 $6,512.00 113.00
<br />
<br /> 0190 MONO-DIRECTIONAL CRYSTAL TYPE $4.00 EACH 370.000
<br /> $1,480.00 0.000 $0.00 313.000 $1,252.00 85.00
<br />
<br /> 0200 BI-DIRECTIONAL YELLOW TYPE I M $4.00 EACH 215.000
<br /> $860.00 0.000 $0.00 233.000 $932.00 108.00
<br />
<br /> 0210 THERMOPLASTIC, NON-PROFILE, 90 $22,750.00 LUMPSUM 1.000
<br /> $zz,7so.oo o.ooa $o.o0 1.aoo $zz,7so.oo 100.00
<br /> 0220 LOOP DETECTORS INSTALLATION $350.00 F3ACH 103.000 $36,050.00 0.000
<br /> $0.00 112.000 $39,200.00 109.00
<br />
<br /> 0230 CONDUIT UNDER HARD SURFACING $82.00 FOOT 295.000 $24,190.00 0.000 $0.00 386.000 $31,652.00 131.00
<br /> 0240 CONDUIT UNDER LANDSCAPED AREAS $51.00 FOOT 118.000
<br /> $6,018.00 0.000 $0.00 289.000 $14,739.00 245.00
<br />
<br /> 0250. JUNCTION BOX, TYPE 1 $300.00 EACH 2.000
<br /> $600.00 0.000 $o.o0 2.000 $600.00 loo.oo