Run Date: 03/10/2009 11:43:17 Page 2 <br /> ' City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 006 <br /> Contractor: WILDISH CONSTRUCTION Original Contract: $830,561.65 <br /> Job 93-004342 Current Amount: <br /> $867,645.40 <br /> Contract No: 2008-00021 Contract Award Date: 04/25/2008 <br /> PO 2008100412 Completion Date: 06/26/2008 <br /> Assessable: No <br /> Current Contract 8stimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> PPP W/H 27TH; AMAZON PKWY TO JEFFERSON ST <br /> General <br /> 0000 Liquidated Damages-27th Ave. ($310.00) DAY 0.000 $0.00 0.000 $0..00 0.00 <br /> 0010 MOBILIZATION $24,500.00 LUMP5UM 1.000 $24,500.00 0.000 $0.00 1.000 $24,500.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $12,000.00 LUMPSUM 1.000 $12,000.00 0.000 $0.00 1.000 $12,000.00 100.00 <br /> 0030 TEMPORARY STRIPING $1,000.00 LUMPSUM 1.000 $1,000.00 0.000 $0.00 1.000 $1,000.00 100.00 <br /> 0040 FLAGGSRS $37.00 HOUR 350.000 $12,950.00 0.000 <br /> $O.DO 298.500 $11,044.50 85.00 <br /> 0050 EROSION CONTROL $2,600.00 LUMPSUM 1.000 $2,800.00 0.000 $0.00 1.000 $2,800.00 100.00 <br /> 0060 TREE PROTECTION $250.00 LUMPSUM 1.000 $250.00 0.000 $0.00 1.000 $250.00 100.00 <br /> 0070 CITY PROVIDED SPEC INFO SIGNS $150.00 EACH 4.000 $600.00 0.000 $0.00 4.000 $600.00 100.00 <br /> 0080 REMOVAL OF PIPES $9.00 FOOT 100.000 $900.00 0.000 $0.00 84.000 <br /> $756.00 84.00 <br /> 0090 SURFACING STABILIZATION $70.00 CUYD 282.000 <br /> $19,740.00 0.000 $0.00 299.100 $20,937.00 106.00 <br /> 0100 10 INCH PVC STORM PIPE $67.00 FOOT 61.000 <br /> $4,067.00 0.000 $0.00 61.000 $4,087.00 100.00 <br /> 0110 8 INCH C90D STORM PIPE $95,00 FOOT 38,000 $3,610.00 0.000 $0.00 23.000 $2,185.00 61.00 <br /> 0120 ADJUSTING BOXES $250.00 EACH 2.000 $500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0130 MINOR ADJUSTMENT OF MANHOLES $1,250.00 BACH 2.000 $2,500.00 0.000 $0.00 3.000 $3,750.00 150.00 <br /> <br /> 0140 MH REM/REPL FRAME/COVER-WW $300.00 EACH 1.000 $300.00 0.000 $0.00 2.000 $600.00 200.00 <br /> <br /> 0150 MH REM/REPL FRAME/COVER-ST $300.00 EACH 1.000 <br /> $300.00 0.000 $0.00 1.000 $300.00 100,00 <br /> 0160 PAVEMENT REMOVAL $3.00 SQFT 1,120.000 $3,360.00 0.000 <br /> $0.00 1,569.000 $4,707.00 140.00 <br /> 0170 COLD PLANE PVMT REMOVAL, 2" D $0.50 SQFT 2,910.000 $1,455.00 0.000 $0.00 6,056.000 $3,028.00 208.00 <br /> 0180 COLD PLANE PVMT REMOVAL, TAPER $0.18 SQFT 41,000.000 $7,380.00 0.000 $0.00 46,838.000 $8,430.84 114.00 <br /> 0190 LEVEL 2, 1/2" DENSE HMAC $53.00 TON 1,530.000 <br /> $81,090.00 0.000 $0.00 1,672.000 $88,616.00 109.00 <br /> 0191 LEVEL 2, 1/2" HMAC PRICE ADJ-M 001 $2.30 TON 172..780 <br /> $397.39 0.000 $0,00 0.000 $0.00 0.00 <br /> 0192 LEVEL 2, 1/2" HMAC PRICE ADJ-J 001 ~ $4.53 TON 1,499.220 <br /> $6,791.47 0.000 $0.00 0,000 $0.00 0.00 <br /> <br />