Run Date: 03/10/2009 12:17:50 <br /> Page 5 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 006 <br /> Contractor: EUGENE SAND CONSTRUCTION Original Contract: $1,677,137.85 <br /> Job 93-004479 Current Amount: $1,761,031.59 <br /> Contract No: 2009-00008 Contract Award Date: 09/12/2008 <br /> PO 2009100130 Completion Date: 06/30/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0610 COLD PLANE PVMT REMOVAL, 2.5"D $0.02 SQFT 77,150.000 <br /> $1,543.00 0.000 $0.00 24,440.000 $488.80 32.00 <br /> 0620 COLD PLANE PVMT REMOVAL, 3" DE $0.02 SQFT 121,500.000 <br /> $2,430.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0630 LEVEL 3, 1/2" DENSE HMAC $68.00 TON 5,542.OD0 <br /> $376,856.00 0.000 $0.00 472.130 $32,104.84 M 9.00 <br /> 0640 LEVEL 3, 3/4" DENSE HMAC $68.00 TON 3,000,000 <br /> $204,000.00 0.000 $0.00 0.000 $0.00 M 0.00 <br /> 0650 CONCRETE CURBS $37.00 FOOT 10.000 <br /> $370.00 0.000 $0.00 O.OOD $0.00 0.00 <br /> 0660 CONCRETE CURB AND GUTTER $32.00 FOOT 42.000 <br /> $1,344.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0670 CONCRETE WIDE CURB AND GUTTER $37.00 FOOT 240.000 <br /> $8,880.00 0.000 $0.00 0.000 $0.00 0.00 <br /> i <br /> 0680 CONCRETE WALKS $7.00 SQFT 642.000 ~ <br /> $4,494.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0690 TRUNCATED DOME TEXTURING $26.00 SQFT 24.000 <br /> $624.00 0.000 $0.00 0.000 $0.00 0,00 <br /> 0700 TUBULAR MARKERS $55.00 EACH 19.000 <br /> $1,045.00 0.000 $0.00 0.000 $0.00 O.OD I <br /> 0710 PAVEMENT LINE REMOVAL $2.00 FOOT 535.O0D <br /> $1,070.00 0.000 $o.oo o.ooo $o.oo o.oD <br /> 0720 PAVEMENT LEGEND REMOVAL $75.00 EACH 6.000 <br /> $4so.oo o.ooo $o.oa o.DOa $o.ao o.Do <br /> <br /> 0730 PVMT LEGEND, TYPE A2 or B: ARR $175.00 EACH 12.000 <br /> $z,loo.oo o.oao $o.o0 1.DOO $17s.aD s.oo <br /> <br /> D740 PVMT LEGEND, TYPE A2 or B: BIC $175.00 EACH 4.000 <br /> $700.00 o.ooa $o.oo o.ooo $o.oo o.oo <br /> <br /> 0750 PVMT LEGEND, TYPE B: LIGHT GRE $7.00 SQFT 500.000 <br /> $3,.500.00 0.000 $0.00 0.000 $0.00 0,00 <br /> <br /> 0760 MONO-DIRECTIONAL CRYSTAL TYPE $5.00 EACH 39.000 <br /> $195.00 0.000 $0.00 19.000 $95.00 49.00 <br /> <br /> 0770 BI-DIRECTIONAL YELLOW TYPE I M $5.00 EACH 390.000 <br /> $1,950.00 0.000 $0.00 24.000 $120.00 6.00 <br /> <br /> 0780 THERMOPLASTIC, NON-PROFILE, 90 $38,500.00 LUMPSUM 1.000 <br /> $38,500.00 0.000 $0.00 0.070 $2,695.00 7.00 <br /> <br /> 0790 REMOVE EXISTING SIGNS $109.00 LUMPSUM 1.000 <br /> $109.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0600 LOOP DETECTORS INSTALLATION $390.00 EACH 15.000 <br /> $5,850.00 0.000 $0.00 0.000 $0.00 O.OD <br /> <br /> 0810 PERMANENT SEEDING $0.63 SQFT 260.D00 <br /> $163.80 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0820 TOPSOIL $83.00 CUYD 5.000 <br /> $415.00 0,000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0830, REPAIR BROKEN STORM PIPE 001 $836.02 LUMPSUM 1.000 <br /> $836.02 0.000 $0.00 1.000 $836.02 100.00 <br /> <br /> 0840 SAWCUT NOTCHES IN GUTTER 001 $2,722.32 LUMPSUM 1.000 <br /> $2,722.32 0.000 $0.00 1.000 $2,722.32 100.00 <br /> $1,761,031.58 $6,173.91 $954,670:96 <br /> <br />