Run Date: 03/10/2009 12:17:50 Page 2 <br /> City of Eugene <br /> ' Contract Preliminary Progress Payment <br /> Payment No 006 <br /> Contractor: EUGENE SAND CONSTRUCTION Original Contract: $1,677,137.85 <br /> Job 93-004479 Current Amount: $1,761,031.59 <br /> Contract No: 2009-00008 Contract Award Date: 09/12/2008 <br /> PO 2009100130 Completion Date: 06/30/2009 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> PPP-Roosevelt Blvd from Chambers to Beltline Hwy <br /> Stage 2- Sta 97+60 to Beltline <br /> 0000 LIQUIDATED DAMAGES-STAGE II ($500.00) EACH 0.000 <br /> $o.oo 0.000 $o.oo 0.000 $D.ao o.oo <br /> Stage 1- Chambers to Sta 97+60 <br /> 0000 LIQUIDATED DAMAGES-STAGE I ($500.00) EACH 0.000 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0000 LIQUIDATED DAMAGES-STAGE I ($1,000.00) DAY 0.000 <br /> $a.oo o.oao $o.oo 0.000 $o.oo o.Da <br /> 0010 MOBILIZATION $40,000.00 LUMPSUM 1.000 $40,000.00 0.000 <br /> $0.00 1.000 $40,000.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $10,000.00 LUMPSUM 1.000 $10,000.00 0.000 <br /> $o.oa 1.000 $10,000.00 100.00 <br /> 0030 TEMPORARY STRIPING $2,500.00 LUMPSUM 1.000 $2,500.00 0.000 <br /> $O.DO 1.000 $2,500.00 100.00 <br /> 0040 PORTABLE CHANGEABLE MESSAGE SI $3,500.00 EACH 2.000 $7,000.00 0.000 <br /> $0.00 2.000 $7,000.00 100.00 <br /> OOSD FLAGGERS $45.00 HOUR 1,000.000 <br /> $45,000.00 0.000 $0.00 1,073.500 $48,307.50 107.00 <br /> 0060 RAILROAD FLAGGERS $90.00 HDUR 100.000 $9,000.00 0.000 <br /> $0.00 47.000 $4,230.00 47.00 <br /> 0070 CITY PROVIDED SPEC INFO SIGNS $150.00 EACH 4.000 <br /> $600.00 0.000 $0.00 4.000 $600.00 100.00 <br /> 0080 EROSION CONTROL $1,200.00 LUMPSUM 1.000 <br /> $i,zao.oa 0.000 $o.oo 1.000 $1,200.00 100.00 <br /> 0090 REMOVAL OF CURB AND GUTTER $13.00 FOOT 26.000 <br /> $338.00 0.000 50.00 0.000 $0.00 0.00 <br /> 0100 REMOVAL OF WIDE CURB AND GUTTB $32.00 FOOT 5.000 $0.00 7.000 <br /> $160.00 0.000 $224.00 140.00 <br /> <br /> ' 0110 REMOVAL OF WALKS AND DRIVEWAYS $42.00 SQYD 12.000 <br /> $504.00 0.000 $0.00 8.200 $344.40 68.00 <br /> 0120 ADJUSTING BOXES $220.00 EACH 8.000 <br /> $1,760.00 0.000 $0.00 23.000 $5,060.00 288.00 <br /> 0130 MINOR ADJUSTMENT OF MANHOLES $860.00 EACH 38.000 <br /> $32,680.00 0.000 $0.00 41.000 $35,260.00 108.00 <br /> 0140 MH REM/REPL FRAME/COVER-WW $275.00. EACH 18.000 $4,950.00 0.000 <br /> $0.00 22.000 $6,050.00 122.00 <br /> 0150 MH REM/REPL FRAME/COVER-ST $275.00 EACH 16.000 $4,400.00 0.000 $0.00 19.000 $5,225.00 119.00 <br /> 0160 SURFACING STABILIZATION $54.00 .CUYD 1,496.000 $80,784.00 0.000 <br /> $0.00 1,342.300 $72,484.20 90.00 <br /> 0170 COLD PLANE PVMT REMOVAL, 0"- 2 $0.16 SQFT 15,110.000 <br /> $2,417.60 0.000 $0.00 3,875.000 $620.00 26.00 <br /> 0180 COLD PLANE PVMT REMOVAL, 1" DE $0.12 SQFT 47,000.000 <br /> $5,640.00 0.000 $0.00 37,607.000 $4,512.84 80.00 <br /> <br />