Final Acceptance Pubficworks <br /> Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> (541)682-8410 <br /> To: Triad Mechanical, Inc. Date: 2/10709 <br /> Attn: Nolan Doyle <br /> 1,419 NE Lombard PI. From: Mike Koivula <br /> Portland, OR 97211 <br /> Project:. Mill Race Flow Control Structure <br /> Contract Number. 2008-14 Job Number: 4495 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the. <br /> City Standard Specfications and Standard Drawings. . <br /> No defects were -noted and/or were .corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer.. <br /> Address: <br /> Owner <br /> Address: <br /> <br /> Q:\PROJECTS\PROJ-S\4495\Coirespondence\Contractors\4495-20090210 Final Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br /> ..Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />