Alton Baker Park Lot 8 Access Road relocation Job #4612 <br /> Good Job number estimate 12/22/2008 <br /> Item Unit ~ Unit Cost Total <br /> Site Survey 1 Is $ 3,500.00 $ 3,500.00 <br /> Design, bid, project rnngmt 50 hr $ 100.00 $ 5,000.00 <br /> Demolition 1 Is $ 6,500.00 $ 6,500.00 <br /> Excavation 1 Is $ 5,000.00 $ 5,000.00 <br /> Concretesidewalk/apron 200 s.f. $ 7.50 $ 1,500.00 <br /> Gravel base 1000 s.f. $ 2.50 $ 2,500.00 <br /> Paving 1000 s.f. $ 4.00 $ 4,000.00 <br /> Subtotal $ 28,000.00 <br /> 10% Contingency $ 2,800.00 <br /> <br /> Grand total $ 30,800.00 <br /> <br />