New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4552 Warranty Begin
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4552 Warranty Begin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:48:03 AM
Creation date
3/4/2009 3:11:31 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004552
GL_Project_Number
985364
Identification_Number
Begin Warranty
Retention_Destruction_Date
3/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> Completion Dates for Contract Projects Eng;neerir,g <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> Eugene, OR 97401 <br /> (541)682-5291 <br /> DATE CONTRACT NO. <br /> 2/17/2009 2009 - 012 <br /> PROJECT NAME JOB NO. <br /> ACORN PARK STREET SIDEWALK from 630' South of W 11th Ave to 360' North of W 13th Ave •4552 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> PROFESSIONAL UNDERGROUND N/A <br /> INSPECTOR- PHONE NUMBER DATE OF AWARD <br /> Michael E. Wilson 541 682-2748 2/11/2009 . <br /> FIRST NOTIFICATION ~ <br /> ~ ~ <br /> 2/17/2009 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED, COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE(S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED.. <br /> COMPLETION <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: • <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> . Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. - <br /> IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT.. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3, #4, and #5, ALL WORK IS <br /> GUARANTEED BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'SNOTICE OF WORK COMPLETION. <br /> MANUFACTURE WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN <br /> THE REQUIRED ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN <br /> WORK THAT BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTYPERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR <br /> WARRANTY PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> Inspector Signature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Constnactionnager File GingerPerales, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration P1C Engineering P\NE As Construct Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-2\4552\Correspondence\Contractors\4552-20090217MEWFirst "Notification.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.