:59PM WILDISH COMPANIES N0. 1008 P.2 <br /> st~~cr. z93s <br /> Apri130'h, 2004 <br /> e D <br /> Steve Gallup, Project Manager ` <br /> City of Eugene Public Works, Engineering <br /> 244 East Broadway <br /> Eugene, OR 97471 <br /> RE: Garden Way ODOT Extras, 39+00 - 43+50 REVISED <br /> Mr. Gallup: <br /> <br /> ' Wildish Consttu~tion Co. has bean asked to .provide a price to increase three <br /> driveways to 8" depth, add rebar at 12" centers, increase adjacent gutter depth to 9", <br /> and inc~trase the ac depth from approximate station 39+00 to 43+50 as extra 2". I have <br /> assumed that the subgrade elevation will remxan unchanged, thus, the rock struchue <br /> under the increased ac depth area will be decreased by 2'. <br /> Refnforc.°d PCC DrivewaYS ~ added ac depth <br /> / 0 6 0 incr8ase driveNra s to 8" de h 6.5 at 570/0 = S 455.00 <br /> ? rp 7 ~ - reGar, 120 each 20' sticks at $8/stick ~ $ 720.00 <br /> f / 0 8.. a!irac:~lo~!S.s L4.t~a.v+~irafar: rel~c~. 5 _ 100.00 <br /> ? r ~ po - 3 masons 8hdeach S55/hr to Ue rebar = S 1 320.00 <br /> Ij oo tncrease utter bar d h to 9' 10 X3701 ~ S 70.00 <br /> +0 4masonhrsto lace:extra ce S55/hr= ; 220.00 <br /> l i'-e .5... of dtlvewa excavation 320% S 150.00 , <br /> 1 / Sv-165 ton :extra ac at S46ROn 7,590.00 <br /> r14~ ExtraGradi forvarieda atestnicture $ 1,000.00"~, <br /> / r s"o- insurance bond, and 90L1 adder S 250.00 <br /> TOTAL = 511,875.00 <br /> ffyou have any questions regarding this matter, please call me at 683-7726. <br /> Respectfully submitted <br /> IS CONSTRUC'1'J CO. <br /> 7aso J. 'te <br /> Fax copy: Steve Gallup 682-8410 <br /> P,O. Box 7428 Eugeno, OR 87401 13800 Wildish Lane Eugene, OR 87408 <br /> T¢Iephone: 541485.1700 Fax; 541663-7722 y^gCN, ' i m <br /> An Equal Opportunltyfmployer <br /> _ _ <br /> <br />