New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PWA-000194 (2)
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PWA-000194 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:57:02 PM
Creation date
2/24/2009 5:11:45 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
003827
GL_Project_Number
905244
Identification_Number
PWA-000194
Retention_Destruction_Date
12/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COST DISTRIBUTION SPREADSHEET <br /> FINAL ASSESSMENT (as of 3/24/06) <br /> JOB NAME: 3rd/4th CONNECTOR <br /> DESCRIPTION: <br /> JOB 3827 <br /> <br /> i CONTRACT: <br /> BY: STEVE GALLUP <br /> CK: STEVE GALLUP <br /> r <br /> Laid C ~ ~,.x- ;a ~w t <br /> ~ts~,~[i sort ~ QT "knit ~ Di~~~t ~ ~~,1C: <br /> ~ ; ~ , ~ Is, _ <br /> 320 r.~ir~oF n~.~usTr,~IErIT or nnwn;tc n1ANHOLE ~ o EF,cH - <br /> 3~~1 A6 PJDOl1 ra~~,~P.1c h-1ANHOLE w~TH CLSM~ 1.5. LS ~ $ 3,000.00 <br /> % 0.28% <br /> 10 MOBILIZATION 1 LS $ 255.02 <br /> 20 TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC 1 LS $ 15.90 <br /> 30 TEMPORARY SIGNS 282 SQUARE FOOT $ 12.81 <br /> 40 FLAGGERS 62 HOUR $ 0.18 <br /> 50 EROSION CONTROL 1 LS $ 4.54 <br /> 60 CONSTRUCTION ENTRANCES 2 EACH $ 1.70 <br /> 70 COMPOST FILTER BERM 0 LIN FT $ <br /> 80 CONSTRUCTION FENCE 390 LIN FT $ 2.77 . <br /> 90 EMULSION DUST PALLIATIVE 0 SQUARE YARD $ - <br /> 610 PERMANENT SEEDING AND MULCHING 0.75 ACRE $ 2.87 <br /> 720 .DETOUR REVISION, CO#1 1 LS $ 2.32 <br /> 0.28% <br /> PSI TESTING 1 LUMPSUM $ 32.54 <br /> LANE COUNTY PUBLIC WORKS TESTING LAB 1 LUMPSUM $ 0.77 <br /> STATON COMPANY -BUILDING DEMOLITION 1 LUMPSUM <br /> SANIPAC -BUILDING DEMOLITION 1 LUMPSUM <br /> SONITROL -BUILDING DEMOLITION <br /> 1 LUMPSUM <br /> PBS ENGINEERING -BUILDING DEMOLITION 1 .LUMPSUM <br /> KIM STUMP REMOVAL -BUILDING DEMOLITION 1 LUMPSUM <br /> PACIFIC ENV -BUILDING DEMOLITION 1 LUMPSUM <br /> OREGON FENCE -BUILDING DEMOLITION 1 LUMPSUM <br /> ADVERTISING 1 LUMPSUM $ 3.66 <br /> BERGESON HZMAT TESTING 1 LUMPSUM <br /> COYOTECREEK WETLAND & PLANT STUDY 1 LUMPSUM <br /> NICHOLS CONSULTING PAVEMENT STUDY 1 LUMPSUM <br /> WETLAND MITIGATION BANK 0.03 .ACRE <br /> WESTATES FLAGG.IN SERVICES FOR GPR 1 LUMPSUM <br /> GPR -GROUND PENTRATING RADAR 1 LUMPSUM <br /> LANE COUNTY WASTE 1 LUMPSUM <br /> PERMITS 1 LUMPSUM <br /> LCOG 1 LUMPSUM <br /> EWEB -EXTRA COST FOR LARGER VAULT LID - 1 LUMPSUM $ - <br /> EWEB -POLE RELOCATE PART OF RNV ACQUISITION - 1 LUMPSUM $ - <br /> EWER -WATER METER AND ELECTRICAL DROP 1 LUMPSUM <br /> EWEB -HYDRANT INSTALL 1 LUMPSUM ' <br /> EWEB -WATER BILLINGS 1 LUMPSUM <br /> LLW INC. WILSON -CRIB LADDER STAIRS FOR EX. BUTTE P 1 LUMPSUM $ - <br /> POS -IRRIGATION HOOKUP 1 LUMPSUM <br /> CITY STRIPING/TRAFFIC CONTROL MATERIALS 1 LUMPSUM $ - <br /> ATTORNEY FEES 1 LUMPSUM <br /> DUNCAN BROWN -REAL ESTATE APPRAISAL SERVICES 1 LUMPSUM <br /> RIGHT OF WAY ACQUISITION 1 LUMPSUM <br /> - <br /> ~ ,.3~~,0. <br /> ENGINEERING CHARGE 23% $ .767.07 <br /> ENGINEERING CHARGE NON-ASSESSABLE 1 LUMPSUM <br /> ADMIN FEE 5% $ 166.75 <br /> CONSTRUCTION FINANCING 3.70492% $ 123.56 <br /> _ ; , <br /> c , a, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.